Cochin Port Trust Seeks Developers for 1.5 MW Floating Solar Project Updated On Fri, May 22nd, 2020 by Saurenergy State-owned Cochin Port Trust has issued an electronic tender inviting bids for setting up of 1.5 MWp grid connected floating solar photovoltaic (PV) power project at CoPT. The scope of project work includes site survey, design, engineering, manufacture, supply, storage, civil work, erection, testing, commissioning of this grid connected floating solar project in the Backwaters […] Read more
World’s Largest Green Hydrogen Project to Launch in California Updated On Fri, May 22nd, 2020 by Saurenergy Global energy company SGH2 has announced that it is bringing the world’s biggest green hydrogen production facility to the City of Lancaster in California. Global energy company SGH2 has announced that it is bringing the world’s biggest green hydrogen production facility to the City of Lancaster in California. The plant will feature SGH2’s pioneering technology, which uses […] Read more
JinkoSolar Tops in Module Shipments to India in Q1 2020 Updated On Fri, May 22nd, 2020 by Saurenergy JinkoSolar Holding, a leading solar module manufacturer, has topped in the list of solar module suppliers to India during the January-March quarter of 2020, as per the research and advisory services provider firm. According to the quarterly report of JMK Research and Analytics, in which it has ranked domestic and international module suppliers based on their shipments […] Read more
Amazon Announces 5 new Solar Projects in China, Australia and US Updated On Fri, May 22nd, 2020 by Saurenergy Amazon has announced 5 new solar energy projects in China, Australia and the US that further support its commitment to reach 100% renewable energy by 2030 Global e-commerce major Amazon has announced five new solar energy projects in China, Australia and the US that further support Amazon’s commitment to reach 80 percent renewable energy by […] Read more
Indian Oil Tenders for Modification of Inverter Telemetry for Rooftop Solar Plants Updated On Thu, May 21st, 2020 by Saurenergy State-owned energy major Indian Oil Corporation Ltd has floated tender inviting electronic bids from eligible bidders for the modification of inverter telemetry for hosting of a real-time generation of rooftop solar plants of Western Region Pipelines (WRPL) on the common digital platform. The work location under the tender will be Indian Oil’s all locations of […] Read more
Tender Issued for Rooftop Solar Systems at Hubballi Dharwad Smart City Updated On Thu, May 21st, 2020 by Saurenergy Hubballi Dharwad Smart City Limited has issued a tender for rooftop solar PV systems worth approximately 340 kWp at government buildings under HDMC area The Hubballi Dharwad Smart City Limited (HDSCL), Karnataka has issued a tender for the commissioning of rooftop solar PV systems worth approximately 340 kWP on discount over retail tariff basis on […] Read more
India’s Solar, Wind Capacity Installation Falls 70% in Q1 2020 Updated On Mon, May 18th, 2020 by Saurenergy The solar and wind energy installations in India fell short by 70 percent with 720 MW of solar energy and 188 MW of wind energy projects installed during the January-March quarter of 2020, as compared to the previous quarter, as per the research and advisory services provider firm. On a yearly basis, India commissioned 35 […] Read more
Solar Companies Resume Manufacturing Cautiously after Govt Eases Lockdown Norms Updated On Mon, May 18th, 2020 by Saurenergy With India slowly opening up its economic activities again after total shutdown for many days amidst coronavirus lockdown, various companies across the clean energy space, whether top brands or startups are also resuming operations by reopening their factories and offices. Despite lockdown continued, the government has provided permission to various companies across sectors to reopen […] Read more
Validity of Solar Project Tariffs Extended Until Sept 30 in Uttarakhand Updated On Sat, May 16th, 2020 by Saurenergy UERC has extended the validity for the benchmark capital cost and levelised generic tariff for solar power projects in Uttarakhand until September 30, 2020. The Uttarakhand Electricity Regulatory Commission (UERC) has published a new order extending the validity period for the benchmark capital cost and levelised generic tariff for solar power projects in the state […] Read more