Coal India Signs its First Solar PPA, 100 MW Deal With GUVNL Updated On Mon, Apr 26th, 2021 by Saurenergy Coal India Limited has signed its very first PPA for the sale of 100 MW of solar power to Gujarat Urja Vikas Nigam Ltd (GUVNL). Coal India Limited (CIL) has announced that it has signed its very first Power Purchase Agreement (PPA) for the sale of 100 MW of solar power to the Gujarat Urja […] Read more
Gautam Solar Increases Solar Manufacturing Capacity From 120 MW to 250 MW in India Updated On Fri, Apr 23rd, 2021 by Saurenergy Gautam Solar has more than doubled its solar panel manufacturing capacity from 120 MW to 250 MW at its facility in Haridwar. Gautam Solar, one of the leading solar manufacturers in the country, has announced that it has more than doubled its solar panel manufacturing capacity from 120 MW to 250 MW at its facility […] Read more
Ahead of Sunset On Brazil’s Solar Subsidies, Developers Race to Secure Projects Updated On Thu, Apr 22nd, 2021 by Saurenergy Brazil, which has disappointed as a market for solar so far, is preparing to bring a new law, passed in March 2021, that will end the country’s transmission network price subsidy. Since only those projects which have been registered with the electricity industry regulator ANEEL by March 2022 will benefit from the soon-to-be scrapped subsidies, […] Read more
Upgrading a Grid Connected PV System To An Energy Storage System Updated On Thu, Apr 22nd, 2021 by Saurenergy Even today, there is a widespread impression among many prospects that a solar system could mean grid independence. Unfortunately, by the time they actually understand the way most solar setups work, especially if you want the benefit of subsidies, they realise that the only way is a grid connected solar plant. However, that is changing. […] Read more
NTPC RFS To Empanel Developers For 1000 MW ISTS Connected Solar Projects Updated On Thu, Apr 22nd, 2021 by Saurenergy National Power generator NTPC has issued a request for selection (RFS) document, with a last date of May 13, for solar developers (SPD) open to setting up Grid- connected Solar-PV Power Projects of aggregate capacity of 1000 MW on the land to be identified & arranged by the SPDs anywhere in India. NTPC shall purchase […] Read more
BHEL Seeks 500 MW Mono PERC Supplier For REWA Solar Park Bid Updated On Tue, Apr 20th, 2021 by Saurenergy State owned Bharat Heavy Electricals Limited (BHEL) has invited bids under two part bid system from manufacturers / suppliers of Mono crystalline Silicon PV Modules for purpose of pre-bid tie up for participating in 500 MW Rewa Ultra Mega Solar Limited (RUMSL) Solar Park tender at Neemuch in Madhya Pradesh. The last date for bids […] Read more
NTPC Commissions 85 MW Solar project in Uttar Pradesh Updated On Tue, Apr 20th, 2021 by Saurenergy National power generator NTPC informed the stock exchanges yesterday that it has commissioned an 85 MW solar power project at Bilhaur in Uttar Pradesh. The filing follows the commissioning of the last leg of 15 MW capacity of the project earlier this month. This 85 MW addition in Bilhaur follows an existing 140 MW capacity […] Read more
Solar O&M Gets Set For The Big League In India Updated On Mon, Apr 19th, 2021 by Saurenergy As India’s solar footprint has grown, from a tentative 3.7 GW in 2015 to over 40 GW now, a little appreciated, but growing opportunity is finally getting its place in the sun too. The Solar Operations and Maintainance (O&M) business. A $4 billion business worldwide in 2019, it is set to be a $9 billion […] Read more
Project Manager – Solar Projects Updated On Sat, Apr 17th, 2021 by Saurenergy The Project Manager will take complete ownership of all projects to ensure LCOE and maximization of yields. Artha being a RESCO developer, expects this role holder to also effectively manage the O&M activities. Detailed attention must be given to adherence to MNRE standards and health and safety protocols. Needless to say, the Project Manager will […] Read more