SUBSCRIBE NEWS LETTER

solar project

SECI Seeking Owners Engineer For Andhra Pradesh Hybrid Project

The last date of submission of the EoI is March 25, 2019. The Solar Energy Corporation of India (SECI) has issued an Expression of Interest (EOI) for the selection of owners engineer for the 160 MW solar-wind hybrid power plant with Battery Energy Storage System (BESS) at Ramagiri, Anantapur District, Andhra Pradesh. The selection of […]

Read more

Top Stories of the Week for Solar Industry

Narendra Modi Flags Off First Ever Diesel to Electric Locomotive Prime minister Narendra Modi has flagged off the world’s first ever diesel to electric converted locomotive at the Diesel Locomotive Works in Varanasi. The Prime Minister unveiled the first of its kind converted electric locomotive during his visit to Varanasi, Uttar Pradesh on February 19, […]

Read more

DuPont, JinkoSolar Join Forces to Launch High-Efficiency Bifacial Module with Transparent Backsheet

Further, this bifacial panel ‘Swan’ will be the latest addition to JinkoSolar’s Cheetah premium range. DuPont Photovoltaic Solutions, together with JinkoSolar Holding unveiled the new Jinko high-efficiency bifacial module “Swan” protected by clear DuPont™ Tedlar® PVF film-based backsheet. Further, this bifacial panel ‘Swan’ will be the latest addition to JinkoSolar’s Cheetah premium range. The company […]

Read more

Construction Begins on 70 MW Solar Power Plant in Assam

CM Sonowal laid the foundation stone of 70 MW Solar Plant at Japisajla village of Assam, the maximum period for the commissioning of the project is 12 months. Chief Minister Sarbananda Sonowal has laid the foundation stone of 70 MW Solar Plant at Japisajla village of Amguri in Sivasagar district in a bid to boost […]

Read more

More Than 100 GW of 1500V Solar Inverters to Be Shipped in Next 2 Years

According to a new report, more than 100 GW of 1500V solar inverters are expected to be shipped in the next 2 years. A new report by consultancy firm IHS Market predicts that having grown from just 2 GW of shipments in 2016 to surpass the 30 GW milestone in 2018, 1500V inverters will continue […]

Read more

MEDA Issues Tender For Rooftop Solar Systems With Battery Backup

The last date of bid submission is March 06, 2019. The Maharashtra Energy Development Agency (MEDA) has issued a tender inviting bids for setting up of total 10 kW of grid-connected rooftop solar PV power plant with battery backup under rooftop net metering at five Anganwadi of Buldhana district in the state. The brief scope […]

Read more

JinkoSolar builds momentum for Transition to Mono PERC Modules in India

JinkoSolar claims to have repositioned itself as a premium market leader in India, especially in the mono PERC technology segment. China-based JinkoSolar has posted its best quarterly result ever in India, with sales performing positively in Q4, delivering close to 160 MW panels. The company says it has achieved a 24% market share in the […]

Read more

Second Tender For 5 MW Rooftop Solar Issued in Maharashtra

The last date of bid submission is March 04, 2019. The Public Works Department (PWD) of Amravati has issued another tender inviting bids for selection of developers to set up cumulative 5 MW of solar capacity rooftop projects at various places distributed in 309 rest houses in different districts of Maharashtra. The rooftop solar projects […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll