NTPC- REL Invites BOS Bids For 1110 MW Wind Project In Karnataka Updated On Mon, Apr 22nd, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) released a tender inviting online bids for Inter State Transmission System (ISTS) connected wind energy project with a nominal capacity of 1110 MW in Bijapur region, Karnataka, Tranche – II The tender invited shared details for detailed design, engineering, micro-siting, manufacturing, supply, erection, testing, commissioning, and proving the guaranteed […] Read more
JinkoSolar Enters BNEF Energy Storage Tier 1 List Updated On Mon, Apr 22nd, 2024 by Saurenergy Continuing the trend of leading solar equipment manufacturers making a mark into energy storage as well, leading globak module maker JinkoSolar makes an entry into Bloomberg NEF’s “BNEF Energy Storage Tier 1 List 2Q 2024”. The admission acknowledges Jinko’s quality as well as ambition to continue to be an integral part of the evolving solar […] Read more
Bihar Set To Expand Its Network Of Floating Solar Plants Updated On Mon, Apr 22nd, 2024 by Saurenergy Bihar, one of the renewable deficit regions in India is now working on alternative plans to boost its renewable energy mix. The state has now pinned hopes on the potential of its water bodies to generate electricity. The eastern Indian state which already has worked to develop floating solar plants in Darbhanga and Supaul high […] Read more
PM Surya Ghar: Elections Defer Timely Disbursement Of Rooftop Solar Subsidies Updated On Mon, Apr 22nd, 2024 by Saurenergy The ongoing elections in the state country seem to have deferred the timely disbursement of central subsidies under the PM Surya Ghar scheme. Prime Minister Narendra Modi earlier this year announced PM Surya Ghar Muft Bijli Yojana with a target to reach out to 1 crore households. The revamped scheme, dedicated to the residential rooftop […] Read more
Swelect, Grew & Renew Win SECI Bid For DCR Solar Modules Updated On Mon, Apr 22nd, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has released the results of its tender where it sought domestic solar panels with domestically manufactured solar cells from Indian solar module manufacturers. SECI declared Swelect Energy Systems, Grew Energy and Renew Photovoltaics Pvt Ltd as winners for the bid. The SECI tender had asked for bids for […] Read more
Everything You Wanted To Know About India’s Biggest Rooftop Solar Scheme Updated On Fri, Apr 19th, 2024 by Saurenergy Made For, Of and By India One of the biggest aspects of the PM Surya Ghar Scheme is the focus on mass markets, by limiting subsidies to systems upto 3kW in size. It is also meant to be a catalyst for India’s domestic manufacturing base for solar equipment, which has struggled to counter Chinese imports […] Read more
ReNew Inks Deal With JERA To Evaluate Green Ammonia Project In India Updated On Fri, Apr 19th, 2024 by Saurenergy Renewable energy company, ReNew Energy Global announced that it has signed an initial agreement with JERA Co, Japan’s power generation company, to jointly evaluate the development of a green ammonia production project in India. Under the agreement, ReNew, through its subsidiary, ReNew E-Fuels Private Limited, and JERA will jointly evaluate development of a green ammonia […] Read more
News Briefs, April 18- Amazon Solar, IREDA, ib Vogt, Sapience Automata Updated On Thu, Apr 18th, 2024 by Saurenergy IREDA’s Strategic Move: GIFT City Office to Boost Green Hydrogen and RE Manufacturing Projects Indian Renewable Energy Development Agency Ltd. (IREDA) has inaugurated an office in GIFT City, Gandhinagar, specializing in the provision of Foreign Currency-denominated debt options which will significantly reduce the financing costs associated with Green Hydrogen and Renewable Energy Manufacturing projects, facilitating […] Read more
Juniper Commission’s 70 MW Maiden Wind Project In Gujarat Updated On Wed, Apr 17th, 2024 by Saurenergy Juniper Green Energy has commissioned its maiden wind power project, which can contribute 70 MW to Gujarat’s renewable energy capacity. Currently, Gujarat has 25.2 MW operational capacity as part of the project’s progressive rollout. Juniper’s project was commissioned in almost 9 months before the scheduled commercial operations date (COD) of the project. This project is […] Read more