Husk Power, Acumen Tie Up To Boost Solar Mini-Grids In Congo Updated On Mon, Jan 27th, 2025 by Saurenergy Husk Power and Acumen today announced $500,000 funding in the form of a grant from Acumen’s Hardest-to-Reach (H2R) initiative to support the company’s entry into the Democratic Republic of Congo (DRC), growing access to decentralized renewable energy solutions in the world’s second-largest population living without access to electricity. Announced at the Mission 300 Africa Energy […] Read more
Global Solar Installations In 2025 To Stagnate At 493 GWdc: Report Updated On Mon, Jan 27th, 2025 by Saurenergy The global solar market continued its growth trend in 2024 to reach 495 GWdc installed capacity, with a 14% increase compared to 2023. A latest Wood Mackenzie report estimates a rise in power demand across regions due to the proliferation of data centers and growing electrification trends. However, the research report also cautions against several […] Read more
Civil Pre-Bid Design Engineer – Solar Ground Mounting Updated On Fri, Jan 24th, 2025 by Saurenergy Responsibilities: Tender Review:- Analyse tender documents technically to identify civil design requirements for solar ground mounting projects. Evaluate project specifications, technical requirements, and deliverables. Prepare technical clarification / Deviation Module Mounting Structure Design:- Develop and optimize designs for module mounting structures (MMS) to ensure efficiency and compliance with standards. Perform structural analysis and validate design […] Read more
Site Incharge – Civil (Solar Industry) Updated On Fri, Jan 24th, 2025 by Saurenergy Study, Review and Circulate the Approved drawings to the Site team for execution Completion of project tasks as per schedule Follow the best construction practices so as to avoid the rework at the site Ensuring the Zero accident at the site during the project Attending the Client meetings Vendor & Contractor management Check the vendor […] Read more
NHPC, AP Genco Form JV To Develop 5 GW PSP Projects Updated On Fri, Jan 24th, 2025 by Saurenergy The National Hydroelectric Power Corporation (NHPC) partnered with Andhra Pradesh Power Generation Corporation Limited (APGENCO) to develop a 5.07 GW pumped storage project (PSPs) across five locations in Andhra Pradesh. The NHPC told about its plans for the joint venture in Andhra Pradesh in a regulatory filing. NHPC said, “The Joint Venture Company envisions planning, […] Read more
News In Brief Jan 24: ACME Solar, LONGi, Sungrow, Qcells Updated On Fri, Jan 24th, 2025 by Saurenergy Rajasthan: ACME Solar Operational RE Capacity Touches 2.54 GW ACME Solar Holdings through its subsidiaries ACME Deoghar Solar Power and ACME Phalodi Solar Energy, has commissioned the remaining capacity of 47 MW and 39.95 MW, respectively. The company commissioned these projects in Rajasthan. The company said in a regulatory filing, “These two plants are now […] Read more
NHPC Awards 1.2 GW Solar-Plus-Storage Tender To Six Bidders Updated On Fri, Jan 24th, 2025 by Saurenergy NHPC, the Navratna company, has announced six winners of its 1.2 GW solar plus storage project. This is NHPC’s one of the first Solar + ESS tender. The project offers a 600 MW/1200 MWh energy storage system (ESS). NHPC allotted the project to Onix Renewables at Rs. 3.09/kWh and three other companies: Jindal India Renewable […] Read more
KSERC Clears KSEBL’s PSA With SECI For 500 MW Project Updated On Thu, Jan 23rd, 2025 by Saurenergy The Kerala State Electricity Regulatory Commission (KSERC) recently reviewed a petition filed by the Kerala State Electricity Board Ltd. (KSEBL) seeking approval for a Power Sale Agreement (PSA) with the Solar Energy Corporation of India (SECI). The agreement entails procuring 500 MW of power, including 250 MW allocated for two hours of peak power supply […] Read more
Rajasthan: POWERGRID Commissions RE Evacuation Projects Updated On Thu, Jan 23rd, 2025 by Saurenergy POWERGRID Sikar Transmission Limited, a wholly owned subsidiary of Power Grid Corporation of India Ltd (PGCIL) today announced the commissioning its assigned work of augmenting the power evacuation from the solar energy zones of Rajasthan. The project was envisioned to evacuate 8.1 GW of green power from the zones. POWERGRID, in its filing before the […] Read more