SUBSCRIBE NEWS LETTER

solar project

SECI Named Nodal Agency to Implement 2,500 MW Wind-Solar Hybrid Project

The eligible capacity for bidding will be a minimum 200 MW and maximum 500 MW by a bidder with project capacity of at least 50 MW at one project site. The Ministry of New and Renewable Energy (MNRE) has appointed Solar Energy Corporation of India (SECI) as the nodal agency for setting up of 2,500 […]

Read more

Consumers, Integrators Seek Single-window for Solar Power Projects in Goa

The integrators were attending the Goa Conference’s second edition on Solar Energy in Panaji, the capital of Goa. They vigorously questioned the role of the electricity department and the GEDA. To deal with all grid-connected solar power projects, Integrators and consumers of solar power systems have appealed for a single window system for smooth installations. […]

Read more

ACME Secures 250 MW Solar PV Project under MSEDCL’s 1,000 MW Bid

The selection process concluded at a very competitive tariff wherein ACME was allotted largest capacity i.e. 250 MW at a tariff of Rs 2.72/kWh. Country’s one of the leading utility-scale solar power developer ACME has won the 250 MW solar Photo Voltaic (PV) capacity in the reverse auction invited by Maharashtra State Electricity Distribution Co […]

Read more

Azure Power Wins 130 MW Solar Power Project in Maharashtra

At the tariff rate of Rs 2.27 per KW Azure Power will sign a Power Purchase Agreement (PPA) with MSEDCL for 25 years. The project is expected to be commissioned in 2019 and will be developed by Azure Power outside a solar park. In a recent auction by Maharashtra State Electricity Distribution Company Limited (MSEDCL), […]

Read more

QUERIES OF PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP

This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/032018 dated 17.04.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […]

Read more

Govt Brings National Policy for Wind-Solar PV Hybrid Projects

A scheme for new hybrid projects under the policy is also expected shortly. The government has issued a new national wind-solar hybrid policy aiming to provide framework for promotion of large grid connected wind-solar PV hybrid system for efficient utilization of transmission infrastructure and land. The Ministry of New and Renewable Energy (MNRE) also said […]

Read more

Solar Power Project Developers Urge MNRE to Defer Auctions

The non-issuance of rules and regulation related to the Inter-State Transmission System (ISTS) and General Network Access has worried developers. It has also caused uncertainty over grid connectivity for the renewable projects in the country. The lingering issue of transmission has prompted solar project developers to urge Ministry of New and Renewable Energy (MNRE) to […]

Read more

Karnataka Gets Three Solar PV Projects Through Rays Power Infra

Open access model implemented in Karnataka enables access to power at considerably lower rates, offering better efficiencies and lower utility bills while reducing the carbon footprint of industries in the areas being serviced by projects built in the state. Under the state’s open access scheme and to add to its portfolio, Rajasthan-based utility company Rays […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll