EV Chargers’ Association Proposes A Black Box To Stop EV Battery Fires Updated On Tue, Jun 28th, 2022 by Saurenergy The recent spate of the batteries in electric vehicles catching fire like e-scooter or four wheeler has sent the Charge Point Operators Society (CPOS) of India into a huddle for a solution because of the concerns over safety deterring the prospective buyers. On June 27, the body proposed that a black box system should be […] Read more
OX2 Looks To Construct 5.5 GW Offshore Wind Farm Off Sweden Updated On Tue, Jun 28th, 2022 by Saurenergy Global renewable energy developer OX2 has announced that it has submitted a permit application under the law that deals with Sweden’s Exclusive Economic Zone for the construction of an offshore wind farm. The project called Aurora will come up between the islands of Gotland and Oland. Sweden is aiming to double its renewable energy capacity […] Read more
Intrakat Collaborates With Parkwind To Develop Offshore Wind Energy In Greece Updated On Tue, Jun 28th, 2022 by Saurenergy A new partnership has been announced between Belgium based Parkwind and Greece’s Intrakat to jointly develop offshore wind opportunities in Greek waters. Bringing offshore development experience and a deep knowledge, the two companies bring forward complementary competences in offshore development and local infrastructure experience. François Van Leeuw, co-CEO, Parkwind, said, “With a partner like Intrakat, […] Read more
160 GWh Of Energy Storage Needed To Meet India’s 2030 RE Target: IESA Updated On Tue, Jun 28th, 2022 by Saurenergy The India Energy Storage Alliance (IESA) has recently brought out a report VISION 2030 that projects India will need at least 160 GWh of energy storage by 2030 in order to integrate the targeted 500 GW of non-fossil fuel energy onto its networks. This energy storage capacity has been calculated as aggregate of front-of-the-meter grid-scale […] Read more
Solution Engineer – Engineering and commissioning Updated On Mon, Jun 27th, 2022 by Saurenergy Develop engineering concepts and schemes, seek approval from customer Preparation database for the project from customer documents. Prepare engineering drawings & documents, guide and monitor junior colleague, ensure correctness of documentation in line with guidelines and customer Specifications, interface with customers / consultants/ internal departments for technical discussions & approvals, report progress (including risks) and […] Read more
Wind Resource Analyst Updated On Mon, Jun 27th, 2022 by Saurenergy Roles & Responsibilities:- Conduct detailed WRA assessments for projects, including micro siting, constraints mapping & PLF assessment for existing projects while procuring land parcels Work with BD for project suitability studies during origination, including WRA assessments, PVsyst analysis, down selection of sites and technical specifications. Lead & maintain the met mast installation and data capture […] Read more
China’s CATL Launches Battery With 1000 km Range On A Single Charge Updated On Mon, Jun 27th, 2022 by Saurenergy Leading battery manufacturer, Contemporary Amperex Technology Co Ltd (CATL) has launched its Qilin battery technology which has a volume utilization efficiency of 72% and an energy density of up to 255 Wh/kg. CATL claims that it has recorded the highest integration level worldwide so far by delivering a range of over 1,000 km . The […] Read more
MNRE Will Invite Bids From States For 8,000 MW Power From Stranded Thermal Plants Updated On Mon, Jun 27th, 2022 by Saurenergy RK Singh, Union Minister of Power and New and Renewable Energy (MNRE), said on June 26 that the government will invite bids from the states to sell electricity generated from 8,000 megawatt (MW) thermal capacities without PPAs after aggregating the demands. About 8,000 MW of thermal capacities across the states in India are without any […] Read more
Tender For 409 EV Chargers Floated By Rajasthan Electronics Updated On Mon, Jun 27th, 2022 by Saurenergy A tender for 409 EV chargers has been released by Rajasthan Electronics and Instruments (REIL). These electric vehicle charging stations will be installed in nine cities and across three national highways and one expressway. This tender includes survey, planning, supply, installation, commissioning, and 3 years of comprehensive onsite Warranty maintenance, trial run, training of these […] Read more