Madhya Pradesh Tenders for 225MW Solar Projects Under PM KUSUM Updated On Tue, Aug 3rd, 2021 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has invited bids for the selection of developers for implementation of approximately 225 MW(AC) grid-connected solar power plants connected to selected 33/11 kV substations under the PM KUSUM program at various locations in Madhya Pradesh. The project size to be installed per substation is 500 kW to 2 […] Read more
Engineer -Solar Updated On Tue, Aug 3rd, 2021 by Saurenergy DNV Energy Systems, Bangalore office is looking for a bright and passionate individual to be part of the Solar team. Position Description:- In this role, you will be directly reporting to Head of Section- Solar. Broad Expectations: Responsible for the delivery of solar consulting services targeted towards project developers, lenders and investors and primarily related […] Read more
Rihand Floating Solar Project Hobbles Ahead, With UPERC Approval On Tariffs Updated On Tue, Aug 3rd, 2021 by Saurenergy Plans for a floating solar project, totaling 150 MW on the Rihand reservoir (linked to Rihand Dam) have finally crossed an important milestone, with the UPERC (Uttar Pradesh Electricity Regulatory Commission) finally approving the same, although not without some mild admonitions to SECI. The order was dated July 30, 2021, and uploaded later to the […] Read more
Key Policy Challenges To a Thriving C&I Market for Solar In India Updated On Mon, Aug 2nd, 2021 by Saurenergy The Solar Energy sector has emerged as a potential green technology to address climate change issues by reducing dependence on conventional fossil fuel-based energy. India has a target to install 100 GW of solar energy capacity with a commitment to increase the renewable sources-based energy capacity to 175 GW by 2022. Under this, 40 GW […] Read more
Floating Solar On A Growth Path Updated On Thu, Jul 29th, 2021 by Saurenergy In Solar’s rise to pre-eminence from a fringe renewable energy option just a decade back, it’s time to consider the rise of floating solar (also called floatovoltaics in many cases). To think that it did not even exist at any scale till 2013. The earliest patent on floating solar was taken out only in 2008. […] Read more
With Safeguard Duty Expiry A Day Away, Solar Bodies in a Huddle For Way Forward Updated On Thu, Jul 29th, 2021 by Saurenergy With the Safeguard Duty (SGD) on solar modules expiring tomorrow, there is predictable anxiety among Indian module manufacturers on the future after the duty expires. Currently, there is an ongoing investigation by the Directorate General of Trade Remedies against alleged Chinese dumping of modules, which has got delayed due to a court intervention. Thus, a […] Read more
India & Germany Partner to Promote Skill Development in Solar Sector Updated On Wed, Jul 28th, 2021 by Saurenergy Rajasthan Solar Association (RSA) and Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH have signed an agreement for skill development in the solar segment, according to media reports. RSA was set up under the Rajasthan Non-Trading Companies Act 1960 for the promotion of Indian solar power industry. RSA members include top international & national companies comprising […] Read more
Wind Developers in Maharashtra Find Limited Support at APTEL Updated On Tue, Jul 27th, 2021 by Saurenergy The Appellate Tribunal for Electricity (APTEL) has ruled in favour of a petition filed by the Wind Independent Power Producers Association (WIPPA), challenging the process by which e-public hearing was conducted by the Maharashtra Electricity Regulatory Commission (MERC) on July 16, 2021. The petitioner filed its petition under Section 121 of the Electricity Act, 2003, […] Read more
GUVNL Revokes Subsidy to 4,000 Solar Projects of Around 2500 MWs Updated On Thu, Jul 22nd, 2021 by Saurenergy A wholly-owned state electricity regulation board in the state of Gujarat, Gujarat Ujrja Vikas Nigam Ltd. (GUVNL) has withdrawn subsidies to small-scale distributed solar projects, hitting about 4,000 projects with an aggregate capacity of around 2500 MW contracted capacity. The purchase price of power produced was fixed at Rs 2.83 per unit which was already […] Read more