MERC Directs MSEDCL to Compensate Solar PV Project Developers Updated On Fri, Jul 31st, 2020 by Saurenergy Solar PV Projects totaling 100 MW will be benefited The Maharashtra Electricity Regulatory Commission (MERC) has provided partial relief to Juniper Green Energy Pvt. Ltd. (JGEPL), and Nisagra Renewable Energy Pvt. Ltd. (NREPL), developers of solar PV projects in Maharashtra. JGEPL and NREPL had petitioned the MERC to intervene and finalize a compensation mechanism and […] Read more
Cochin Port Trust Seeks Developers for 1.5 MW Floating Solar Project Updated On Fri, May 22nd, 2020 by Saurenergy State-owned Cochin Port Trust has issued an electronic tender inviting bids for setting up of 1.5 MWp grid connected floating solar photovoltaic (PV) power project at CoPT. The scope of project work includes site survey, design, engineering, manufacture, supply, storage, civil work, erection, testing, commissioning of this grid connected floating solar project in the Backwaters […] Read more
Vedanta Seeking Developers for 100 MW Solar Projects in Odisha Updated On Wed, Mar 4th, 2020 by Saurenergy Vedanta Limited has issued an RfP for the selection of developers for setting up a 100 MW solar project under the BOOT Model at multiple land parcels of Vedanta in Odisha. Vedanta Limited has issued a Request for Proposal (RfP) for the selection of developers for setting up of 100 MW ground-mounted solar project through […] Read more
Uzbekistan Seeking Private Developers for 400 MW Solar Projects Updated On Wed, Feb 26th, 2020 by Saurenergy The Ministry of Energy of Uzbekistan has invited EoI from private developers to build and operate two solar projects worth 400 MW capacity in the country. The Ministry of Energy of Uzbekistan has invited expression of interest (EoI) from private developers to build and operate two solar projects worth a combined 400 MW capacity in […] Read more
NBCIL Invites Developers For Setting Up Solar Projects Under CPSU-II Scheme Updated On Thu, Apr 25th, 2019 by Saurenergy The Corporation has identified factory lands spanning over 10.46 acres in Ghaziabad for the development of solar power plants. The National Bicycle Corporation of India (NBCIL), a Government of India Undertaking, with reference to SECI’s 2000 MW grid-connected solar PV projects under CPSU Scheme, Phase-II, Tranche-I has invited government producers interested in participating in the […] Read more
Solar Energy Sector Losing Sheen With Developers Shunning Projects Updated On Mon, Nov 19th, 2018 by Saurenergy Solar Energy Corporation of India (SECI) issued tenders for 1,200 megawatt (MW) of wind-solar hybrid scheme and 10,000 MW solar tender linked to manufacturing units Once touted as the sunrise sector, solar energy industry is losing is its sheen with developers showing reluctance towards bidding for projects. Solar Energy Corporation of India (SECI) issued tenders […] Read more
AMENDMENT-I, PPA & PSA : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Fri, Oct 12th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/R1/092018 dated 06.09.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject tender has […] Read more
QUERIES OF PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Tue, May 15th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/032018 dated 17.04.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […] Read more
Solar Power Project Developers Urge MNRE to Defer Auctions Updated On Mon, May 14th, 2018 by Saurenergy The non-issuance of rules and regulation related to the Inter-State Transmission System (ISTS) and General Network Access has worried developers. It has also caused uncertainty over grid connectivity for the renewable projects in the country. The lingering issue of transmission has prompted solar project developers to urge Ministry of New and Renewable Energy (MNRE) to […] Read more