In a First for City, Chandigarh to Welcome Three Solar Plants with Robotic Cleaning Updated On Mon, Feb 20th, 2023 by Saurenergy Operated by the Municipal Corporation, three material recovery facility (MRF) centres are set to welcome rooftop solar energy power plants. These plants will boast of robotic cleaning equipment. This is a first such initiative for the city. The project, worth Rs 6.69 cr has received the green signal from Chandigarh Renewal Energy and Science and […] Read more
SECI Invites Bids for 2 MWh Solar Project with 1 MW BESS in Himachal Pradesh Updated On Mon, Feb 20th, 2023 by Saurenergy SECI (The Solar Energy Corporation of India) is inviting bids to construct a 2 MWh solar project and a 1 MW Battery Energy Storage System (BESS) in Kaza, Himachal Pradesh. The last date for online submission of bids is 03.04.2023 till 1400 Hours and tenders will be opened on the same day at 1600 Hours. […] Read more
Coal India Floats Tender for EPC of 35 MW Solar Project Updated On Mon, Feb 20th, 2023 by Saurenergy Coal India Limited has issued a tender for design, engineering, procurement and supply, construction, erection, testing and commissioning of 35 MW (ac) solar PV power plants. The plants are at the three locations of Eastern Coalfields Ltd (ECL) with comprehensive O&M of the plant and the associated transmission system for five years. ECL is a […] Read more
SolarSpace Announces Long-Term Partnership with PAIC & Ariel Re Updated On Fri, Feb 17th, 2023 by Saurenergy Solar manufacturer SolarSpace has announced a long-term alliance with the insurance company, PAIC (Ping An Insurance (Group) Company of China Ltd.) and Ariel Re of Lloyd’s of London, a reinsurer institution, will provide 25-30 years of power loss compensation liability insurance service for the module products of SolarSpace. Representative from Lloyd’s expressed, “SolarSpace’s high-efficiency PV […] Read more
MSEDCL RFS For 200 MW Wind Power From Intra State Projects Updated On Fri, Feb 17th, 2023 by Saurenergy The Maharashtra State Electricity Distribution Company Limited (MSEDCL) has issued a tender for the procurement of 200 MW of wind power through a competitive bidding process followed by e-reverse auction from intra state wind power projects. The state discom has placed a ceiling tariff of Rs 2.65/kWh for the bids. Bidders will have to provide […] Read more
India’s Renewable Energy Installation Stands at 168 GW, Coal-Based Power Grows 536 MW in a Year Updated On Thu, Feb 16th, 2023 by Saurenergy Central Electricity Authority has revealed in its installed electricity capacity report that the renewable energy capacity of the country has crossed 168 GW but the speed of the RE expansion doesn’t give out a comfortable picture considering India’s 2030 targets. The RE installed capacity of India as on January 31, 2023 stands at 168,399 MW. […] Read more
Volkswagen’s EV Charging Firm Electrify America Launches New Project for EV Solar Charging Updated On Thu, Feb 16th, 2023 by Saurenergy Volkswagen’s fast-charging public network firm Electrify America has announced the launch of “Solar Glow 1”, a cleantech project in the Golden State of California. The 75 MW solar power project to be established in San Bernardino County, California will produce 225,000 MWh of clean electricity annually. For the project that looks at charging electric vehicles […] Read more
NTPC Operationalises 50 MW Solar Project in Nokhra, Bikaner Updated On Thu, Feb 16th, 2023 by Saurenergy State-owned entity National Thermal Power Corporation (NTPC) has said in a BSE revelation that consequent upon successful commissioning, third part capacity of 50 MW out of 300 MW Nokhra Solar PV Project at Bikaner, Rajasthan, is declared on Commercial Operation from February 16, 2023. NTPC mentioned that the first part capacity of 100 MW has […] Read more
Dept of Science & Technology, Chandigarh Issues Tender for 4000kwp Canal Top Power Plant Updated On Thu, Feb 16th, 2023 by Saurenergy The Department of Science and Technology has issued a tender for the design, manufacture, supply, erection, testing and commissioning including warranty operation and maintenance for 10 years for a 4000kwp canal top solar photovoltaic power plant. The plant will be set up in Chandigarh. The bid submission start date is 21-02-2023 at 6:00 PM. The […] Read more