RESULTS OF E-BIDDING AND E-RA FOR 1200 MW ISTS-CONNECTED WIND-SOLAR HYBRID POWER PROJECTS (TRANCHE-I) Updated On Wed, Feb 13th, 2019 by Saurenergy For Full information: Click here Read more
Kochi Metro Looking For Land to Set Up Solar Plant to Power Water Metro Updated On Fri, Feb 8th, 2019 by Saurenergy The tender for the first batch of 23 air-conditioned ferries that can carry up to 100 passengers will be awarded by March. The Kochi Metro Rail Limited (KMRL) is on the lookout for land to develop a solar power plant to generate electricity to power and operate its forthcoming fleet of Water Metro Ferries from […] Read more
TENDER FOR DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING AND O&M OF 50 MW (AC) SOLAR PHOTO VOLTAIC POWER PLANT AT KASARGOD SOLAR PARK, KERALA Updated On Fri, Feb 8th, 2019 by Saurenergy This has reference to the RfS No. SECI/C&P/NIT/2019/THDC50 dated 08/02/2019 regarding Design, Engineering, Procurement, Supply, Construction, Erection, Testing, commissioning and O&M of 50 MW (AC) Solar PV Power Plant at Kasargod Solar Park, Kerala The RfS document has been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and https://eprocure.gov.in/cppp/. Prospective bidders are requested to refer to TCIL […] Read more
Chandigarh Administration Seeks Power Usage Details With Plans to Go Solar Updated On Thu, Feb 7th, 2019 by Saurenergy The Chandigarh Administration has asked different departments in the Union Territory with their own buildings to provide details of their power consumption to the UT, as it plans to install rooftop solar power systems on government buildings. The Chandigarh Administration has asked different departments in the Union Territory with their own buildings to provide details of their power […] Read more
CCEA approves proposal for setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects Updated On Wed, Feb 6th, 2019 by Saurenergy The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister, Shri Narendra Modi, has approved the Ministry of New & Renewable Energy’s proposal for implementation of the Central Public Sector Undertaking (CPSU) Scheme Phase-llfor setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects, by the Government Producers with Viability Gap Funding (VGF) support […] Read more
DEWA and Siemens Begin Development of Solar-Powered Hydrogen Project Updated On Tue, Feb 5th, 2019 by Saurenergy The facility is being built at DEWA’s outdoor testing facilities in the R&D Centre at the Mohammed bin Rashid Al Maktoum Solar Park in Dubai. The Dubai Electricity and Water Authority (DEWA), Expo 2020 Dubai and Siemens have begun work on what is soon to become the first solar-powered hydrogen electrolysis facility in the Middle […] Read more
Farmers Granted Option to Pick Solar-Powered Tube-Wells Updated On Tue, Jan 29th, 2019 by Saurenergy 75 percent cost of the solar connection will be borne by the state government in the form of subsidy. The Dakshin Haryana Bijli Vitran Nigam (DHBVN) has rolled out the facility of solar-powered tube wells for farmers across the state. At a price point which will be nearly 40 percent less than the conventional systems […] Read more
Tata Power Solar’s Residential Rooftop Solution Now in Bangalore Updated On Fri, Jan 25th, 2019 by Saurenergy Tata Power Solar has launched a residential rooftop solution in Bangalore after a successful debut in Delhi, Mumbai, Ajmer, Bhubaneswar and Gandhinagar. Tata Power Solar, one of India’s largest solar energy company, has now launched its complete residential rooftop solution in Bangalore. The residential rooftop solutions are expected to save up to Rs 50,000 […] Read more
Tata Power Solar takes its Residential Rooftop offer to Gandhinagar Updated On Tue, Jan 22nd, 2019 by Saurenergy The solution is expected to save upto Rs 50,000 annually for 25 years. Boosting the solar portfolio, Tata Power’s solar arm has recently launched its complete residential rooftop solution in Gandhinagar, Gujarat. The solution is expected to save up to Rs 50,000 annually for 25 years. The company had launched its rooftop solar services back […] Read more