April 18 – KPI Green, Shakti Pumps Lead Strong Green Move On Another Tough Day For Markets Updated On Thu, Apr 18th, 2024 by Saurenergy On yet another down day for the markets, our green pack continued to more than hold its own, with 7 of the 11 stocks being tracked in the green. Leading the charge, besides the by now inevitable upper circuit for Waaree Renewable, is KPI Green Energy, and Shakti Pumps. While KPI Green has been adding […] Read more
IEA’s PVPS Report 2024- Five Key Highlights Updated On Thu, Apr 18th, 2024 by Saurenergy The International Energy Agency’s PVPS program or Photovoltaic Power Systems Programme is promoting and facilitating the exchange and dissemination of information on the technical, economic, environmental and social aspects of PV power systems. it currently has 31 members, with India, and even the India backed International Solar Alliance (ISA), notable absentees. However, their 2024 report […] Read more
CleanMax, Apple Partner To Accelerate Renewable Adoption In India Updated On Thu, Apr 18th, 2024 by Saurenergy Renewable energy company–CleanMax (Clean Max Enviro Energy Solutions) today announced a joint venture with Apple. As part of the partnership, Clean Max has successfully installed 14.4 MW of rooftop solar installations across six industrial sites in India. These installations are expected to mitigate around 207,000 tons of carbon dioxide (CO2) emissions throughout their operational life. By […] Read more
Juniper Commission’s 70 MW Maiden Wind Project In Gujarat Updated On Wed, Apr 17th, 2024 by Saurenergy Juniper Green Energy has commissioned its maiden wind power project, which can contribute 70 MW to Gujarat’s renewable energy capacity. Currently, Gujarat has 25.2 MW operational capacity as part of the project’s progressive rollout. Juniper’s project was commissioned in almost 9 months before the scheduled commercial operations date (COD) of the project. This project is […] Read more
Trina Storage To Bring 5MWh Elementa 2 Platform In Middle East Updated On Tue, Apr 16th, 2024 by Saurenergy Energy storage product & solution provider Trina Storage has announced the release of the 5MWh variant of its innovative Elementa 2 platform in the Middle East. Following the successful global launch of the 4MWh Elementa 2 in London, this Middle East debut showcases Trina Storage’s commitment to innovation in sustainable energy solutions. Building upon Trina […] Read more
Senior Engineer Updated On Tue, Apr 16th, 2024 by Saurenergy Testing & Repairing of electronics Component & PCB. Inspection of incoming material BOM preparation and assembly of test fixture. Gerber design verification. Maintenance of test jig developed by central O&M team Material planning & handling of PCB repair station Planning and scheduling activities Inventory control & Management Supervising smooth implementation of the project. Data Entry in SAP […] Read more
Site Incharge/Deputy Site Incharge Self O&M_AM Updated On Tue, Apr 16th, 2024 by Saurenergy The Wind turbine Engineer/Technician will act as part of team to achieve safe and efficient Operation and Maintenance of WTG. To attend the breakdown calls & to ensure the smooth operation of the WPP. To share ownership of WECs along with PM team for execution of PM as per stipulated Schedules. The Wind Technician will […] Read more
JLR Develops Portable BESS Using Second-Life Range Rover Updated On Tue, Apr 16th, 2024 by Saurenergy Jaguar Land Rover (JLR) partnered with energy storage start-up, Allye Energy, to create Battery Energy Storage System (BESS). A single Allye MAX BESS holds seven second-life Range Rover and Range Rover Sport PHEV battery packs that can be simply removed from the vehicles and slotted into customized racks, without unnecessary additional processing. Each BESS can […] Read more
DEME’s Offshore Vessel Completes Turbine Foundation Work In Scotland Updated On Tue, Apr 16th, 2024 by Saurenergy Belgium-based offshore energy company, DEME’s flagship ‘Orion’ completed monopile installation works on Ocean Winds’ Moray West offshore wind farm project in Scotland. Despite harsh winter conditions, DEME swiftly installed 29 monopiles in approximately two months. Meanwhile, DEME’s DP2 jack-up vessel ‘Apollo’ is installing the transition pieces. The Moray West offshore wind farm, developed by Ocean […] Read more