Gujarat Tops In Residential Rooftop Programme: Govt Data Updated On Fri, Aug 11th, 2023 by Saurenergy A recent data from the Lok Sabha on Residential Rooftop Solar Systems indicated that India had garnered a total of 2.1 GW of solar power through the residential rooftop solar scheme of the Union government in Phase II of the programme. MNRE Minister RK Singh shared the data during his written reply before the House. […] Read more
ACEN Inks RECAU Agreement with Laguna Lake Development Authority in Philippines Updated On Fri, Aug 11th, 2023 by Saurenergy Makati-based ACEN, through its subsidiary companies, entered into a significant Renewable Energy Contract Area Utilization (RECAU) agreement with the Laguna Lake Development Authority (LLDA) in the Philippines. The purpose of this agreement is to secure the lease of 800 hectares of Renewable Energy Areas (REAs) located in Laguna. This pivotal arrangement signifies ACEN’s commitment to […] Read more
BluPine Wins 100 MW & ACME Bags 500 MW in RUVNL Tender Updated On Thu, Aug 10th, 2023 by Saurenergy Rajasthan Urja Vikas Nigam Limited’s (RUVNL’s) tender for the development of 1200 MW of solar with storage projects has declared BluPine Energy and ACME as winners. While BluPine bagged a quantity of 100 MW at INR 6.68/Kwh, ACME won 500 MW out of the quoted 600 MW at INR 6.69/kWh. The auction was held in […] Read more
Statkraft in Agreement with Biopharmaceutical Firm for Offtake of Energy from Wind Farms Updated On Wed, Aug 9th, 2023 by Saurenergy Norway’s International Power Producer Statkraft has entered into a PPA with Sweden’s biopharmaceutical firm AstraZeneca towards energy procurement from three wind farms in Sweden. The PPA is based on the commissioning of the new wind farms in Strömstad and Årjäng, which is in Sweden’s bidding area 3 (SE3). This is also where AstraZeneca’s research and […] Read more
The Top 5: Improbable Energy Storage Possibilities Turned into Reality Updated On Wed, Aug 9th, 2023 by Saurenergy The storage for renewable energy in particular has become one of the main talking points in the energy industry across the globe for the sake of transition to a green future. Intermittent energy sources like wind and solar power often lack the ability, or fall short in their capacity, to accommodate postponed usage. Thus, there […] Read more
Manager – Project Management Updated On Mon, Aug 7th, 2023 by Saurenergy Provides technical and commercial support for NEXTracker customers worldwide, ensuring a best in class customer experience and providing product and systems expertise to maximize customer value Supports all activities that drive Customer Satisfaction and order fulfilment Have strong customer care experience and be able to effectively communicate resolutions for customer concerns Support NEXTracker product procurement […] Read more
C&I Segment: Group Captive Mode to Drive Installations in FY24-FY25-CareEdge Ratings Updated On Mon, Aug 7th, 2023 by Saurenergy A new report from CARE Ratings predicts sunny times for solar power through Group captive mode in India’s C&I segment. Commercial & Industrial (C&I) consumers in India have the option to purchase power either through a third-party power plant or through a captive/group captive power plant besides procuring power from the designated utility in their region. […] Read more
1 TW Renewable Potential in Egypt: A Game-Changer or a Distant Dream? Updated On Fri, Aug 4th, 2023 by Saurenergy Egypt has the potential to produce electricity capacity of 350 gigawatts (GW) from wind energy and 650 GW from solar energy, the Minister of Electricity and Renewable Energy Mohamed Shaker suggested at the fourth edition of the round table on the green hydrogen industry in Egypt, chaired by Egypt’s Prime Minister Mostafa Madbouly. The claim […] Read more
Sterling and Wilson Renewable Energy Continues Its Revival With Big Order Wins Updated On Fri, Aug 4th, 2023 by Saurenergy Sterling and Wilson Renewable Energy Limited (SWRE or SWSOLAR) the leading renewable EPC, announced that it has won orders worth INR 826 crore in the first four months of FY 2023-24. The orders aggregate to around 1 GWp and include projects in Rajasthan, Uttar Pradesh and Gujarat. Scope of work for all projects include design, […] Read more