SUBSCRIBE NEWS LETTER

solar power

Himachal Pradesh Energy Development Agency Tenders 1.1 MW of Rooftop Solar

The Himachal Pradesh Energy Development Agency 1.1 MW rooftop solar power project will consist of 50 rooftop solar systems installed on different buildings of HRTC. The Himachal Pradesh Energy Development Agency tendered 1.1 MW of rooftop solar in Himachal Pradesh. The bid-submission deadline is May 12, 2017. The entire capacity will consist of 50 rooftop […]

Read more

Solar Mounting Structures: Racking Matters

Globally, solar installations have been growing at an impressive pace. A large share of growth has been contributed from India, and with 100GW of target by 2022 in its hand, India is on the verge of becoming the world’s biggest solar nation. Continuous reduction in the solar system prices with respect to higher grid rates […]

Read more

Maharashtra Solar Energy Policy

Maharashtra Solar Energy Policy Updates 2017 As per the new proposed changes by Maharashtra Electricity Regulatory Commission (MERC) in July 2017 the new regulations will be called the Maharashtra Electricity Regulatory Commission (Net Metering for Roof-top Solar Photo Voltaic Systems) (First Amendment) Regulations, 2017. Some of the highlights of the proposed changes are as follows: […]

Read more

Kerala Solar Energy Policy

OBJECTIVE Objective of the state solar policy include:- Increase the installed capacity of the solar sector in the State to 500MW by 2017 and 2500 MW by 2030. Contribute to long term energy security of the State of Kerala as well as ecological security by reduction in carbon emission. Adopt a multi-pronged approach in targeting […]

Read more

West Bengal Solar Energy Policy

TARGET As per MNRE there is a target to harness 5336 MW of solar power through grid connected projects and through rooftop in the state. LAND ALLOTMENT Government land, if available, permission for use will be given for 30 years or the project life whichever is less. Land to be allocated and transferred to WBGEDCL, […]

Read more

Jharkhand Solar Energy Policy

Jharkhand Solar Energy Policy Updates 2017 A 50 percent subsidy to residential consumers and a 10 percent subsidy to commercial (industrial) consumers installing rooftop solar will be provided by the Jharkhand State government, the policy was implemented in July 2017. OBJECTIVE The objectives of the Policy are as follows To encourage participation of private sector […]

Read more

Jharkhand Yet to Sign PPAs for 1.1 GW of Solar

The differences on the quoted tariff have halted the signing of the PPA for 1.1 GW solar power project between the state distribution company (DISCOM) and developers in Jharkhand. In Jharkhand, power purchase agreements (PPAs) for 1.1 GW of solar projects that were auctioned in March of 2016 (LoIs signed May 2016) are yet to […]

Read more

Haryana Solar Energy Policy

Haryana Solar Energy Policy Updates 2017 A discussion paper was released by the Haryana Electricity Regulatory Commission (HERC) in July 2017, stating Terms and Conditions for Determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation (RPO) and Renewable Energy Certificate (REC)) Regulations, 2017. The draft mentioned the useful life for solar power projects determined […]

Read more

Chhattisgarh Solar Energy Policy

OBJECTIVE To encourage, develop and promote solar power generation in the State with a view to meet the growing demand for power in an environmentally and economically sustainable manner. To enhance the private sector participation in solar power generation. To create a favorable environment for development of solar manufacturing capabilities within the State. To contribute […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll