What Happens When Low Quality, Unproven Materials are Used in Solar Panels? Updated On Tue, Oct 23rd, 2018 by Saurenergy Revealing the Results of over 4 million solar panels inspected in 275 installations across the world INTRODUCTION The quality of PV modules and the materials used in them can be best assessed by evaluating their performance in the field. Challenging climatic conditions, like those in India, cause severe environmental stresses for PV materials in the […] Read more
FLIR Systems Announces Industry-First Deep Learning-Enabled Camera Family Updated On Tue, Oct 23rd, 2018 by Saurenergy FLIR Firefly Integrates Intel® Movidius™ Myriad™ 2 VPU to Enable Deep Neural Networks for On-Camera Inference FLIR® Systems, Inc. (NASDAQ: FLIR) today announced the FLIR Firefly® camera family, the industry’s first deep learning inference-enabled machine vision camera. The FLIR Firefly, which integrates the Intel® Movidius™ Myriad™ 2 Vision Processing Unit (VPU), is designed for image analysis professionals using deep learning […] Read more
Canadian Solar, Biosar to Build Total Eren’s 256 MW Solar Proj in Australia Updated On Mon, Oct 22nd, 2018 by Saurenergy Post completion, the project is expected to be the single largest solar power plant in Victoria, Australia, and will produce enough electricity to meet the needs of more than 133,500 Victorian homes and displacing more than 610,000 tonnes of carbon dioxide emissions annually. Solar PV modules maker Canadian Solar and solar EPC services provider Biosar Australia […] Read more
DELTA DELCEN HV SERIES – 1500vdc Grid Tied Solar Central Outdoor Inverter Updated On Mon, Oct 15th, 2018 by Saurenergy The continuous evolution of Solar panel technology to higher DC Voltages up to 1500V has helped to lower the Balance of system costs, higher output power capability leading to reduction in Energy production costs. Delta’s commitment to be on par and adapt with this latest technology developments of other interactive systems has led to the […] Read more
JSW Energy puts solar power plans on backburner over policy Updated On Mon, Oct 15th, 2018 by Saurenergy As uncertainties loom over the solar power sector, mainly on the policy front, the Sajjan Jindal-led JSW Energy has put its ambitious expansions plans in the segment on the backburner. The company in May had announced plans to set up a 1,000-MW solar photovoltaic (PV) panel manufacturing facility at Vijayanagar in Karnataka and to install […] Read more
EnSync Energy Sells 20-Yr Solar-Plus-Storage PPA with Kona Brewing Updated On Tue, Oct 9th, 2018 by Saurenergy As per the deal, the agreement will finance a solar-plus-energy storage system at the beer company’s new brewery in Kailua Kona, Hawaii. EnSync Energy Systems has sold a 20-year Power Purchase Agreement (PPA) with Kona Brewing Company to an undisclosed investor. As per the deal, the agreement will finance a solar-plus-energy storage system at the beer company’s new […] Read more
Punjab Policy on Net Metering for Grid Interactive Roof-Top Solar PV Power Plants Updated On Mon, Oct 8th, 2018 by Saurenergy Scope and Application:- (1) This Policy shall apply to the distribution licensee and consumers of distribution licensee of the State of Punjab. (2) The eligible consumer may install the rooftop solar system under net metering arrangement which; (a) shall be within the permissible rated capacity as defined under this Policy. (b) shall be located in […] Read more
Punjab Solar Energy Policy Updated On Mon, Oct 8th, 2018 by Saurenergy 1. OBJECTIVES Objective of the state solar policy include:- 1.1 Punjab has considerable potential in NRSE sector which is being harnessed. With a view to maximize the utilization of these resources; this policy aims to achieve the following objectives: To maximise and improve the share of new and renewable sources of energy to 10% of […] Read more
Bihar Gov’t Buildings to Get Rooftop Solar from November Updated On Mon, Oct 8th, 2018 by Saurenergy The center and the state government have to equally share the burden of installing similar rooftop solar systems on individual households, organizations and government buildings according to the scheme. Under its grid connected rooftop scheme, Bihar Government has handed-over the task of installing rooftop solar systems on government buildings to Bihar Renewable Energy Development Agency […] Read more