Mumbai’s CSMI Airport Sets Up Electric Vehicle Fast Charging Stations Updated On Mon, Dec 12th, 2022 by Saurenergy India’s EV development has drawn attention as people are increasingly inclined to make thoughtful travel decisions. Against this backdrop, Mumbai’s Chhatrapati Shivaji Maharaj International Airport (CSMIA) has erected six sturdy DC rapid EV charging stations at Terminals 1 & 2 to make a substantial contribution to the country’s green infrastructure while understanding travelers’ preferences. Standing […] Read more
Denmark’s Vestas to Supply Turbines for 236 MW Wind Project in Finland Updated On Mon, Dec 12th, 2022 by Saurenergy Global wind energy player Vestas has announced that it has received a 236-MW order from Suomen Hyötytuuli Oy, a long-term client from Pori, to power the Siikajoki wind project in North Ostrobothnia in Finland. The official statement of Vestas held that the order consists of 38 V162-6.2 MW wind turbines and includes supply, installation, and […] Read more
Greenko Bags NTPC’s 3000 MWh Energy Storage Project Tender Updated On Fri, Dec 9th, 2022 by Saurenergy Greenko Energies has emerged as the lowest bidder by a significant margin for NTPC Renewable Energy’s auction to set up interstate transmission system (ISTS)-connected energy storage systems of 3,000 MWh capacity with a minimum of 500 MW capacity to be installed anywhere across India. Greenko won the entire capacity by quoting Rs 27.9 lakh /MWh/year, […] Read more
EDF Renewables, Wärtsilä to Develop 50 MW/100 MWh Energy Storage in UK Updated On Fri, Dec 9th, 2022 by Saurenergy Finnish company which manufactures and services power sources Wärtsilä has announced that it has signed a contract with EDF Renewables UK and Ireland to deliver a new grid-scale energy storage facility in the United Kingdom. The storage system will be delivered in Sundon, Bedfordshire. The official statement of Wärtsilä held that the 50 MW/100 MWh […] Read more
IIT Madras Installs a Wave Energy Generator Off the Coast of Tamil Nadu Updated On Thu, Dec 8th, 2022 by Saurenergy IIT Madras researchers asserted to have created an energy converter that can produce electricity from ocean waves. The second week of November saw the successful conclusion of the trials. The test was carried out in collaboration with the Motilal Nehru National Institute of Technology (MNNIT) Allahabad and the Andhra Pradesh-based firm Virya Paramita Energy (VPE). […] Read more
Plans To Prepare Grid For 500 GW Of Renewables Announced For India Updated On Wed, Dec 7th, 2022 by Saurenergy India continues to put the building blocks in place for meeting its ambitious climate goals, of which one of the biggest ones, 500 GW of renewable power capacity by 2030 is well and truly on its way. Matching intent with ability is the latest plan titled “Transmission System for Integration of over 500 GW RE […] Read more
MSEDCL Offers 12 yr PPA In RFS for 300 MW Wind Project Updated On Wed, Dec 7th, 2022 by Saurenergy After a push from Hybrid projects, wind energy continues to get a fillip from state level demand too. The Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) has invited RFS (request for selection) for procurement of 300 MW of wind power on a long-term basis through a competitive bidding process from inter-state wind power projects. The […] Read more
JSW Energy Commissions 27 MW Wind Energy Plant Updated On Wed, Dec 7th, 2022 by Saurenergy The commissioning of 27 MW of wind energy generation capacity was part of the first phase of JSW Energy’s 450 MW wind project at Tuticorin in Tamil Nadu, according to an announcement. In a BSE filing, the company announced that “JSW Renew Energy Two Ltd, a step-down subsidiary of JSW Energy, has started phase-wise commissioning […] Read more
Vivid Solaire’s Plea to Align LTA with Revised SCOD of Project Shot Down by CERC Updated On Tue, Dec 6th, 2022 by Saurenergy The Central Electricity Regulatory Commission (CERC) has rejected the petition of Vivid Solaire Energy Private Limited to reconsider Long-Term Access (LTA) to coincide with the revised SCOD of project and waive the transmission charges. In its petition, the Pune-based firm had filed a petition seeking a waiver for the levy of transmission charges by CTUIL […] Read more