“There is no scheme for ore-refining, converting them into cathode materials” Rajat Verma, CEO & Founder, Lohum Updated On Wed, Mar 1st, 2023 by Saurenergy Powering next-gen li-ion battery mobility and energy solutions, making second lives for batteries a reality through reuse technology, and lithium ion battery recycling, Lohum is proving to be a gamechanger in the battery recycling and repurposing space. Rajat Verma, CEO & Founder, Lohum, offers insights into the battery recycling industry, providing an overview into the […] Read more
IOC Sets Sights on RE Capacity Addition, EV Charging Among Others in Restructuring Spree Updated On Mon, Feb 27th, 2023 by Saurenergy The Chairman of Indian Oil Corporation (IOC) Shrikant Madhav Vaidya has said that the CPSU has set its sights on green hydrogen plants at all its refineries. The timeline for this goal has been set for 2047. The announcement comes as part of the Rs 2 lakh crore planned for green transition towards net-zero emissions. […] Read more
Micro Irrigation and Command Area Development Authority Updated On Mon, Feb 27th, 2023 by Saurenergy Planning, Design, Supply, Installation, Testing, Commissioning and Operation & Maintenance for 3 Years (including three years free maintenance of on-farm Micro irrigation System)after one year assured performance demonstration /defects liability period, whichever is later, of Grid/Solar Powered Integrated Micro-Irrigation Schemes in the command(s) of the existing outlets of various distributaries/minors in various Districts of Haryana […] Read more
Karnataka & Gujarat Lead in Clean Energy Transition; Odisha, Bihar, UP Laggards Updated On Mon, Feb 27th, 2023 by Saurenergy A new study conducted in unison by IEEFA (Institute for Energy Economics and Financial Analysis) and Ember to create the States’ Electricity Transition (SET) Scoring System. The report takes a look at 16 states in India. The report has analyses 16 Indian states that make up 90% of the country’s yearly power needs. The states […] Read more
Michigan-Headquartered ONE Introduces ‘Aries Grid’ Renewable Energy Storage Updated On Fri, Feb 24th, 2023 by Saurenergy Michigan-headquartered Our Next Energy (ONE) has launched Aries Grid, a lithium iron phosphate (LFP) utility-scale battery system that can serve as long-duration energy storage. ONE said that Aries Grid will be manufactured in America and it represents a milestone achievement in efforts to scale-up investments in renewable energy infrastructure and grid reliability. “Energy storage is […] Read more
X-ELIO Sets up its First Utility Scale 60 MWh BESS Project in Texas, US Updated On Fri, Feb 24th, 2023 by Saurenergy X-ELIO, that delves into the development, construction, financing and operation of renewable and sustainable energy projects, has added a BESS (battery energy storage system) project of 60 MW capacity, which has been set up in the Liberty County of Texas in the USA. This is a major project for X-ELIO, given that this is the […] Read more
Common O&M Problems With Inverters In the Winter Time Updated On Thu, Feb 23rd, 2023 by Saurenergy Background Solar plants, if planned and maintained well, can comfortably withstand winters too. With winter comes cold temperature and sometimes extreme weather, such as snow, freezing rain, or even polar freezes. In low temperatures, you need to pay more close attention to your inverter’s operation and maintenance (O&M). This episode from Solis’ seminar series, we […] Read more
AES Aims to Develop Hybrid RE Project in Chile with 3,100 MWh BESS Updated On Wed, Feb 22nd, 2023 by Saurenergy AES Chile, a producer and distributor of electricity and a subsidiary of US-based AES Corporation, is moving ahead with its plan to develop a hybrid renewable energy project that will also harbour a battery based energy storage system (BESS) with a capacity of 3,100 MWh. In a key development, AES Chile has submitted the EIA […] Read more
Command Area Development Authority Updated On Wed, Feb 22nd, 2023 by Saurenergy Planning, Design, Supply, Installation, Testing, Commissioning and Operation & Maintenance for 3 Years (including three years free maintenance of on-farm Micro Irrigation System) after one year assured performance demonstration/defects liability period, whichever is later, of Grid/Solar Powered Integrated Micro-Irrigation(IMI) Schemes in the command of the existing canal outlets of various distributaries/minors in various Districts of […] Read more