NTPC-VVN Invites Bids For 250 MW/500MWh Standalone BESS Project Updated On Fri, Jun 21st, 2024 by Saurenergy NTPC Vidyut Vyapar Nigam Limited (NTPC-VVN), a Central Public Center Enterprise released a tender inviting bids for setting up 250 MW/500MWh Standalone Battery Energy Storage Systems (BESS) in India. NTPC VVN invited bids for the selection of battery energy storage system (BESS) developers for setting up 500 MWh (250 MW x 2 hrs) standalone Battery […] Read more
Associate Tech Lead – Electrical Engineering Updated On Thu, Jun 20th, 2024 by Saurenergy Associate Tech Lead will work as part of the Electrical Engineering team and have responsibility for the design and development of Electrical Subsystems for various product lines (New Product Developments (NPD), Quality improvement and Productivity projects). The role will have strong focus on new technologies, processes and applying these technologies to various product lines. Responsibilities:- Design […] Read more
Cabinet Approves Viability Gap Funding For Offshore Wind Updated On Thu, Jun 20th, 2024 by Saurenergy The Indian Union Cabinet chaired by Prime Minister Narendra Modi recently approved the Viability Gap Funding (VGF) scheme for offshore wind energy projects. The total outlay of the scheme stood at Rs 7,453 crore. The fund included an outlay of Rs 6,853 crore for the installation and commissioning of 1 GW of offshore wind energy […] Read more
NTPC REL Invites Bids For 1000 MW Wind Energy Project In Karnataka Updated On Wed, Jun 19th, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has invited bids for the balance of the system package of an Inter-State Transmission System (ISTS)-connected wind energy project with a capacity of 1000 MW in Davangere Region in Karnataka under (Tranche-IV). The NTPC-REL tender was mandated the bidders to take up the responsibility of detailed design, engineering, micro-siting, […] Read more
NTPC Issues Tender For 600kw/3000kwhr Vanadium BESS Updated On Wed, Jun 19th, 2024 by Saurenergy NTPC Limited has now issued a tender seeking parties for 600Kw/3000Kwhr Vandium Redox Flow Battery (VRFB) Storage System. The Central Public Sector Enterprise (CPSE) issued the tender for its NTPC Energy Technology Research Alliance (NETRA) center. The tender mandates the bidders to supply, commission and integrate the BESS for the NTPC’s NETRA power needs. The […] Read more
Honeywell Forays Into AI Battery Manufacturing Platform Updated On Tue, Jun 18th, 2024 by Saurenergy Honeywell has announced the launch of its Battery Manufacturing Excellence Platform (Battery MXP), an artificial intelligence (AI)-powered software solution designed to optimise the operation of gigafactories from day one by improving battery cell yields and expediting facility startups for manufacturers. With traditional standalone solutions, battery manufacturers’ material scrap rates can be as high as 30% […] Read more
Project Manager Updated On Tue, Jun 18th, 2024 by Saurenergy Provides technical support for NEXTracker customers worldwide, ensuring a best-in-class customer experience and providing product and systems expertise to maximize customer value Develop and maintain technical understanding of PV solar tracking systems and associated tools Supports the Project Manager, Senior Project Manager, and/or Program Manager in all activities that drive Customer Satisfaction and order fulfillment […] Read more
SECI Awards 1200 MW Hybrid Project With A Tariff Of Rs 3.43/Unit Updated On Sat, Jun 15th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has now awarded the contracts for its earlier issued tender for 1200 MW to six project developers. The proposed tender was meant to develop the wind-hybrid renewable projects in India for Inter-State Transmission System (ISTS). With the announcements of the results, SECI was able to get a tariff […] Read more
NTPC May Take Up Its Renewable Portfolio To 30 GW Soon Updated On Fri, Jun 14th, 2024 by Saurenergy India’s power behemoth, NTPC Limited is now all set to achieve 30 GW of renewable capacity in the next few years. As per the top management of the company the company currently has a total renewable portfolio of 3.6 GW. However the current pace of works goes on, the Indian Central Public Sector Enterprise (CPSE) […] Read more