The Australia Experience: How Energy Storage is Transforming National Grids Updated On Mon, Sep 30th, 2024 by Saurenergy Energy storage has undeniably emerged as a critical component in the growth of solar energy. For much of the last decade, high installation costs and the intermittent nature of renewable energy sources were major barriers to wider adoption. However, advancements in technology and government subsidies have significantly reduced these costs, with increased competition and production […] Read more
Manufacturing Process Engineer – Mechanical Updated On Fri, Sep 27th, 2024 by Saurenergy Here is the key role of what you will do… Collaborate with R&D teams to manage transfer from prototype to mass production. Partner with external suppliers to document and analyze manufacturing processes for mechanical and motion control products. Identify and implement critical to quality (CTQ) characteristics and create control plans to ensure product quality […] Read more
Principal Electrical Engineer – Primary Updated On Fri, Sep 27th, 2024 by Saurenergy Responsibilities:- Ability to lead the Primary Design (Concept, FEED , Detail Design) for AIS/GIS/Hybrid Substations upto 400kV – for Utility Companies /Developers, based on international standards – for, UK, Europe, Middle East , South East Asia or Australia regions. Experience in Design of HV/LV Distribution systems for Oil & Gas Sector , offshore Substation, Thermal […] Read more
Volue Set To Build Trading Platform For RE Operators Updated On Fri, Sep 27th, 2024 by Saurenergy Volue, a Norwegian technology company headquartered in Oslo, recently launched its new Position Closer solution’s SaaS model for the energy market. Volue Position Closer is a software module launched, as part of the new ‘Volue Green Empower Ecosystem’. Over the next 18 months and beyond, Volue plans to expand this ecosystem with several new modules, […] Read more
MAHAPREIT and NTPC Sign RE Projects Worth 10 GW Updated On Fri, Sep 27th, 2024 by Saurenergy NTPC Green Energy Ltd (NGEL) is a wholly owned subsidiary of NTPC Ltd, under which a joint venture agreement was signed with Mahatma Phule Renewable Energy and Infrastructure Technology, MAHAPREIT. Together, the two firms are set to develop 10 GW of renewable energy parks and projects in the state of Maharashtra or other states in […] Read more
MERC Declines To Give Relief To EESL Over ‘Change of Law’ Claim Updated On Wed, Sep 25th, 2024 by Saurenergy The Maharashtra Electricity Regulatory Commission (MERC) in its latest order declined any relief to the Energy Efficiency Services Ltd (EESL). The case was related to the petition of the government entity, seeking compensation of Rs 27 crore. EESL sought this amount due to the rise of taxations on solar equipment during the developmental phase of […] Read more
81% of RE Additions In 2023 Were Cheaper Than Fossil Fuels: IRENA Updated On Wed, Sep 25th, 2024 by Saurenergy Renewables remain competitive despite fossil fuel prices returning closer to historical cost levels, concludes Renewable Power Generation Costs in 2023, released by the International Renewable Energy Agency (IRENA) at the Global Renewables Summit during the UN General Assembly in New York today. Of the record 473 gigawatts (GW) added in 2023, 81% or 382 GW […] Read more
Himachal Pradesh To Invest In Pumped Storage projects Updated On Wed, Sep 25th, 2024 by Saurenergy Himachal Pradesh Chief Minister, Thakur Sukhvinder Singh Sukhu said the State has decided to enter the sector of Pumped Storage Projects (PSPs). He said that PSPs are considered one of the most dependable mechanisms towards a balanced supply of power from renewable sources like solar and wind energy. Himachal has been the leader in mini-hydel […] Read more
Engineer – Primary Updated On Tue, Sep 24th, 2024 by Saurenergy This role is responsible to execute & analyse, design, test, or support integration required to define and support systems that meet business standards and program / product requirements. General responsibilities:- Responsible for Solar /BESS design at OTR & ITO Project. Align with Lead Engineer / Internal Stake holder to define the capacity of the Plant, […] Read more