IEA Forecasts 40% Drop In Battery Storage Costs By 2030 Updated On Fri, Apr 26th, 2024 by Saurenergy International Energy Agency’s (IEA) recent report on the use of batteries in electric vehicles (EVs) and battery storage installations has shown that developer costs of batteries will decline by 40% by 2030. The report was prepared after studying the use of solar PV plus batteries and found the total upfront costs of utility-scale battery storage […] Read more
KPI Green Delivers Stellar Q4 and full year Results, 1.23 GW project Pipeline Updated On Fri, Apr 26th, 2024 by Saurenergy Surat-based Solar EPC firm KPI Green Energy has come out with a strong set of Q4 results. Total revenues came in at Rs 293 crores during the quarter, a 59% increase over the corresponding quarter in Fy23. Net profit rose Rs 43 crores, up 36% over the same quarter last year. For the full year, […] Read more
Manager – Product Management Updated On Thu, Apr 25th, 2024 by Saurenergy Responsibilities Product Strategy and Roadmap: Develop and execute a comprehensive product strategy and roadmap for renewable energy products, aligned with business objectives and market trends. Overall Product Management: Benchmark, Cost, Price, Reliability , Performance , Warranty , Generation, LCOE of projects w.r.t Module performance. Assess the Market Demand for each Product Variant. Market Research and Analysis: Conduct market […] Read more
Grew Energy’s 200 MW Module Contract From SECI To Support Market Building Updated On Thu, Apr 25th, 2024 by Saurenergy Grew Energy has scored in the Solar Energy Corporation of India’s (SECI) auction, clinching the largest share of a 200 MW module supply contract. According to a press release by Grew Energy, the company’s mandate entails the testing, packaging, forwarding, supplying, and transporting of solar PV modules. Grew Energy has been domestically manufacturing solar cells […] Read more
CERC Allows Fortum Subsidiary To Retain Connectivity For 300 MW Karnataka Project Updated On Thu, Apr 25th, 2024 by Saurenergy In an interesting order earlier this week, the Central Electricity Regulatory Commission allowed SolarOne Energy Private Limited, a subsidiary of Finnish major Fortum, to retain 300 MW connectivity it had been allotted from the Central Transmission Utility of India Limited (CTUIL). The issue arose after CTUIL moved to cancel connectivity citing failure to sign PPA […] Read more
Global PV Cumulative Capacity Rose To 1.6 TW In 2023: IEA Updated On Wed, Apr 24th, 2024 by Saurenergy International Energy Agency’s International Power Photovoltaic System Program (IEA-PVPS) recent report found the global PV cumulative capacity grew to 1.6 TW in 2023. IEA-PVPS a collaborative R&D Agreements established within the IEA in its recent study showed, “1 581 GW of minimum installed cumulative capacity was installed by the end of 2023. At least 407.3 […] Read more
Highland Materials Set To Add 20K Tonnes Polysilicon Capacity In US Updated On Tue, Apr 23rd, 2024 by Saurenergy The IRA (Inflation Reduction Act) driven manufacturing bandwagon is still picking up pace in the US. The latest announcement comes from Polysilicon manufacturer Highland Materials, that has secured US$255.6 million in 48C tax credits to build a polysilicon plant in the US. The announcement comes even as global polysilicon prices, mirroring the rest of the […] Read more
NTPC- REL Invites BOS Bids For 1110 MW Wind Project In Karnataka Updated On Mon, Apr 22nd, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) released a tender inviting online bids for Inter State Transmission System (ISTS) connected wind energy project with a nominal capacity of 1110 MW in Bijapur region, Karnataka, Tranche – II The tender invited shared details for detailed design, engineering, micro-siting, manufacturing, supply, erection, testing, commissioning, and proving the guaranteed […] Read more
Premier Energies To Seek Rs 1500 Crore In IPO Soon Updated On Mon, Apr 22nd, 2024 by Saurenergy Premier Energies Limited, India’s second largest integrated solar cell and solar module manufacturer (in terms of annual installed capacity of 2 GW and 3.36 GW, respectively as per a Frost & Sullivan Report), as of March 31, 2024, has filed the draft red herring prospectus (DRHP) with capital markets regulator, SEBI to raise more than […] Read more