Ministry Of Finance Grants Navratna Status To SECI, NHPC And SJVN Updated On Mon, Sep 2nd, 2024 by Saurenergy In a significant indicator of their growing stature and performance, the Ministry of Finance recently conferred ‘Navratna’ status to three Central Public Sector Enterprises (CPSE) namely, Solar Energy Corporation of India (SECI), National Hydroelectric Power Corporation (NHPC), and SJVN to develop and expand Renewable Energy (RE) capacity in India under the Ministry of New and […] Read more
Renewables Contribute Only 4% To NTPC’s Turnover in FY24 Updated On Mon, Sep 2nd, 2024 by Saurenergy According to the latest numbers from India’s power giant NTPC, renewable energy assets contribute a mere 1.23% to the company’s turnover. When hydro projects are included, this figure increases to just 4%. NTPC Limited’s Business Responsibility and Sustainability Report indicates that power generation accounts for 94.19% of the company’s total turnover. The report reveals that […] Read more
MERC New Regulation Sets 7% Flexible Demand Target For Next Five Years Updated On Fri, Aug 30th, 2024 by Saurenergy Given the evolving context of generation profiles from various types of generation plants, including those behind the meters (within consumer premises), and the significant emphasis on solarizing agricultural feeders and households, it is now imperative to view demand-side management as an opportunity. This opportunity includes a combination of demand flexibility, demand response, energy efficiency, and […] Read more
The Key To the Next Phase of RE Growth: Evolution of Large-Scale Batteries Updated On Fri, Aug 30th, 2024 by Saurenergy The renewable energy industry has been on a transformative journey over the past few decades. At the heart of this revolution lies large-scale battery storage which is considered to be one of the most critical technological advancements. These batteries have evolved from small, short-duration systems to massive, long-duration powerhouses that are now integral to the […] Read more
NTPC Issues 1.2 GW Hybrid Tender With 600 MW Greenshoe Option Updated On Fri, Aug 30th, 2024 by Saurenergy NTPC has released a tender to select hybrid power generators for the supply of 1.2 GW of power from inter-state (ISTS)-connected wind-solar hybrid power projects anywhere in India. This project has a greenshoe option for an additional capacity of up to 600 MW on a Build-Own-Operate (BOO) basis with 20th of September set as the […] Read more
Senvion Secures 86.4 MW Order From Continuum Green Energy Updated On Thu, Aug 29th, 2024 by Saurenergy Wind turbine manufacturer Senvion India announced a new order of 86.4 MW from Continuum Green Energy in Gujarat. With this order, Senvion will be delivering a total of 270 MW across five projects to Continuum. Senvion India was acquired by Saudi Arabia based Alfanar in 2021 from its German parent, Senvion Gmbh. At the time […] Read more
Report Bats For Boosting R&D On Agro Voltaics Updated On Thu, Aug 29th, 2024 by Saurenergy A latest analysis by scholars at EMBER, an energy think tank said that the agro photovoltaic ecosystem needs more attention especially in the research and development segment. This, the researchers said is needed to boost the deployment of the system where solar power generation and agriculture go hand in hand without hindering its others avenues. […] Read more
2023: Onshore Wind Struggles With Permits, Grid Issues: Report Updated On Thu, Aug 29th, 2024 by Saurenergy According to a recent report by energy research body– BloombergNEF (BNEF), the global transition towards clean electricity has reached new milestones, with wind and solar contributing 13.9% which is reported to reach a new record high. Additionally, a pair of new reports and findings from two reports published by BNEF: Power Transition Trends 2024, and […] Read more
Project and Commissioning Engineer Updated On Wed, Aug 28th, 2024 by Saurenergy As a Project and Commissioning Engineer, you will drive project management and engineering actions, ensuring timely completion. Additionally, manage customer relationships throughout the project lifecycle, while maintaining seamless communication channels with internal and external stakeholders. Key responsibilities:- Conduct onsite installation and configuration of SCADA/ SCADA HMI systems and monitoring devices, including rigorous testing, seamless start-up, […] Read more