Hindalco Ponders Venture Into Solar Module Manufacturing Updated On Fri, Sep 20th, 2024 by Saurenergy Hindalco Industries Ltd., a member of the Aditya Birla group, is considering manufacturing of solar modules in Gujarat as part of its entry into renewable energy. It is planning the new manufacturing at one of its locations in Gujarat, expanding its involvement in the renewable energy industry. This accompanies the goal for India to grow […] Read more
Powergrid Bags Khavda 7GW RE Transmission Project Updated On Fri, Sep 20th, 2024 by Saurenergy The Powergrid Corporation of India Limited (PGCIL) announced a new renewable energy evacuation project from Khavda in Gujarat. The Central Public Sector Enterprise (CPSE) informed the stakeholders regarding the latest development in its filing before the stock exchange. As per the plan, the company with this project will help in evacuating 7 GW of green […] Read more
DAS Solar, Smartsun Complete 82 MW Solar Project in Greece Updated On Thu, Sep 19th, 2024 by Saurenergy DAS Solar, a company having expertise in N-type PV technology, and Smartsun, a top Greek company specializing in the design and construction of solar energy projects, have successfully completed solar parks in northern Greece with a total capacity of 82 MW. The projects utilize 136,000 rectangular N-type TOPCon modules from DAS Solar, designed for maximum […] Read more
Maharashtra To Solarise 272 Govt Schools, Issues Tender Updated On Thu, Sep 19th, 2024 by Saurenergy The Maharashtra government has now planned to solarise 272 Zila Parisad schools in the state. The Maharashtra Energy Development Agency (MEDA) has issued a tender in this regard. Under the plan, the state nodal agency has planned smaller grid-connected rooftop solar projects of 2kW each at these schools. The tender said that with a total […] Read more
Assam Issues Draft Net Metering Guidelines For Solar Projects Updated On Wed, Sep 18th, 2024 by Saurenergy The Assam Electricity Regulatory Commission (AERC) has released a draft notification, outlining the guidelines for group net metering and virtual net metering for renewable energy. The northeastern state, in its guidelines, stated, “The distribution licensees will be required to facilitate and bear the capital expenditure for Service Line cum Development (SLD). This aims to facilitate […] Read more
Tata Power Renewable Energy Secures 400 MW Hybrid Project from MSEDCL Updated On Wed, Sep 18th, 2024 by Saurenergy Tata Power Renewable Energy Limited (TPREL), the green arm of the Tata Power Company Limited, has successfully secured a Letter of Award (LoA) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL), a wholly owned entity under the Maharashtra Government, for the development of a 400 MW Wind-Solar Hybrid project in Maharashtra. The LoA includes […] Read more
Gautam Solar Announces Cell Making Foray With 2 GW Capacity Updated On Wed, Sep 18th, 2024 by Saurenergy New Delhi based Gautam Solar, a 27+ years experienced solar manufacturer, is preparing to launch a significant venture to establish a 2 GW solar cell manufacturing plant in the first phase. With an estimated investment of Rs. 1000 crores for the 2 GW solar cell facility, the company wants to cater to the growing demand […] Read more
Torrent Power Wins 1,500 MW/12,000 Energy Storage Bid From MSEDCL Updated On Wed, Sep 18th, 2024 by Saurenergy Torrent Power Limited recently secured a 1,500 MW pumped hydro storage project from the Maharashtra State Electricity Distribution Co. Limited (MSEDCL). Under this mutually agreement provisions, Torrent Power will procure 1,500 MW/12,000 MWh of energy storage capacity from the pumped hydro storage (PSP) project. MSEDCL will provide a detailed Letter of Award (LOI) after obtaining […] Read more
Consultant – Solar Projects Updated On Wed, Sep 18th, 2024 by Saurenergy The candidate will be responsible for the design, engineering, and review of the complete DC system. Responsible for finalizing technical specifications of the project and shall issue a comprehensive RFP accordingly. Hands-on experience in designing & engineering entire solar plants and should be able to handle the entire engineering process and knowledge of IS, IEC, […] Read more