Sungrow Showcases Tech Innovations at Mexico’s Solar Trade Show Updated On Fri, Nov 12th, 2021 by Saurenergy Sungrow, an inverter solutions supplier for renewables, showcased a comprehensive product portfolio covering utility and C&I PV and energy storage solutions at Solar Power Mexico, a solar energy trade show, on November 9th through the 11th. The Mexican market is supported by low solar prices and is ripe with opportunity as solar grows. Mexico has […] Read more
TATA Projects Bags 120 km Transmission Line Project in Bangladesh Updated On Fri, Nov 12th, 2021 by Saurenergy TATA Projects Limited, an Indian infrastructure company, has announced that it has forayed into Bangladesh’s Transmission and Distribution (T&D) sector by securing a 400 KV double circuit transmission line project valued at approximately INR 900 crore (USD 120 million) from Power Grid Company of Bangladesh Limited (PGCB). This 120-km length project from Barapukuria to Bogura […] Read more
ISRO Can Spot Ideal Locations for Installing Solar Projects Updated On Wed, Nov 10th, 2021 by Saurenergy Indian space agency can suggest the ideal location to put up a solar power farm with the data gathered from its geostationary earth observation satellites within and outside India, said a top official at the Indian Space Research Organisation (ISRO). He also said the technology can be transferred to those who are interested. “We have demonstrated […] Read more
Senior Solar Engineer – Energy Updated On Tue, Nov 9th, 2021 by Saurenergy Burns & McDonnell India (BMI) Energy Division is looking for a well-rounded and driven solar PV design engineer in the Mumbai Office to assist with conceptual design of solar developments and to perform the detailed design of solar projects. The conceptual design will involve collecting preliminary site information, performing site layouts, and iterating different technology […] Read more
Solar Development Engineer – Asia Updated On Tue, Nov 9th, 2021 by Saurenergy In this role, you will work with business development leads in key countries to ensure projects deliver maximum value. You will also manage key interfaces with global engineering and global EPC teams to confirm that minimum standards are met, and projects are delivered on-time and on-budget. You are expected to assess, secure and de-risk Shell’s […] Read more
Vector Green and Evergreen Power In MoU For Wind Power Projects Updated On Tue, Nov 9th, 2021 by Saurenergy Vector Green Energy Pvt Ltd (Vector Green) and Evergreen Power Mauritius Pvt Ltd (Evergreen Power) have entered into a MoU to develop around 300 MW of wind power projects in India through greenfield development. Vector Green is a renewables focused Independent Power Producer (IPP), wholly owned by funds managed by Global Infrastructure Partners India LLP. […] Read more
Has Punjab Scored A Self Goal With Its Talk Of Renegotiating Solar tariffs? Updated On Mon, Nov 8th, 2021 by Saurenergy News Reports of the government of Punjab contemplating renegotiation of solar power rates for pre 2016 projects paint a strange picture. While the reports quote the view of Punjab government sources that the difference in rates between then and now is too high to be allowed, they don’t mention the fate of the other state […] Read more
With 31% of Free Standing Houses Going Solar, Australia Leads Globally In Per Capita Solar Updated On Mon, Nov 8th, 2021 by Saurenergy The rooftop solar success story in Australia has been well documented. A new report now puts the results of those numbers in perspecttive. Driven by a combination of subsidies, lowering costs, and the utility of having an off grid option in far flung areas, rooftop solar in Australia is almost as common as owning a […] Read more
Andhra Energy Minister Iterates Plans To Purchase of 7000 MW of Solar Power Through SECI Updated On Mon, Nov 8th, 2021 by Saurenergy Andhra Pradesh energy Balineni Srinivasa Reddy has repeated his government’s plans to procure 7000 mega watts (MW) of solar power from the Solar Energy Corporation of India (SECI) to ensure free power to 18 lakh farmers for nine hours until 2046. That would seem to imply supplies starting this year for the next 25 years. […] Read more