GUVNL Floats Bids for 600 MW Solar Projects With A Greenshoe Option Updated On Fri, Sep 30th, 2022 by Saurenergy Gujarat Urja Vikas Nigam (GUVNL) has floated a tender to purchase power from 600 MW of grid-connected solar power projects at the Khavda Solar Park, Gujarat. There is a greenshoe option with an additional capacity of 600 MW for inclusion in this tender. The last date for submitting the bid for this 600 MW solar […] Read more
UPNEDA Invites Bids for 50 MW of Rooftop Solar Projects in UP Updated On Fri, Sep 30th, 2022 by Saurenergy Uttar Pradesh New & Renewable Energy Development Agency (UPNEDA) has invited bids for 50 MW (Cumulative Capacity) of grid-connected rooftop solar projects. The government and semi-government buildings in Uttar Pradesh will host these solar projects. The Renewable Energy Service Company (RESCO) model will be used for each project on a net-metering basis. The last date […] Read more
Shining Bright. India’s Solar Start Ups Updated On Fri, Sep 30th, 2022 by Saurenergy When Prime Minister Narendra Modi launched the Start Up India movement in 2015 on August 15, perhaps even he wouldn’t have imagined the role startups were going to play in India’s clean energy transition. After all, the energy sector, with its tremendous policy overhang, large capital commitments, and the need for a long term perspective […] Read more
Maharashtra Invites Bid for 50000 Solar Pumps Under PM-KUSUM Yojna Updated On Fri, Sep 30th, 2022 by Saurenergy Continuing with its efforts to encourage innovation in the solar pump industry, Maharashtra Energy Development Agency (MEDA) has invited bids to install 50000 solar water pumps under component-B of the Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Yojna. These pumps will be grid-connected submersible of 3, 5, and 7.5 horsepower (HP). The last […] Read more
BPCL Floats Tender for 6 MW Solar Power Plant Installation at Kochi Updated On Fri, Sep 30th, 2022 by Saurenergy PSU refiner Bharat Petroleum Corporation Limited (BPCL) has invited bids to set up a 6 MW solar power plant at its Kochi refinery in Kerala. The last date for submitting the bid for this 6 MW solar power project is October 14, 2022, & bids will be opened on the same day. This BPCL solar […] Read more
Hitachi Astemo Builds 3-MW Solar Power Plant in Maharashtra Updated On Fri, Sep 30th, 2022 by Saurenergy Japanese automaker Hitachi Astemo has announced that it has installed a ground mounted solar power plant of 3-MW at its manufacturing plant in Jalgaon, Maharashtra. The company said that the solar power plant is built in an area of 43301 sq meters employing 7128 ground mounted solar panels and 10 inverters. The 3-MW Jalgaon solar plant […] Read more
Sungrow Surpasses 14-GW Shipments in Indian Solar Market Updated On Fri, Sep 30th, 2022 by Saurenergy Leading global inverter and energy storage system supplier for RE, Sungrow Power Supply, has said that it has surpassed 14 GW inverter shipments in the Indian market. Sungrow said that it took less than one year to reach 14-GW as the 10-GW record was achieved in November, 2021. The 4 GW sales since then are […] Read more
Jupiter Power, Energy Vault Partner for 2.4 GWh of Domestic-Content-Qualified BESS Updated On Thu, Sep 29th, 2022 by Saurenergy Texas-based utility-scale battery energy storage systems (BESS) developer and operator, Jupiter Power has announced the execution of an agreement with Switzerland-headquartered grid-scale energy storage solutions provider Energy Vault Holdings. Under the agreement, Jupiter Power and Energy Vault will collaborate to secure 2.4 GWh of supply chain equipment and services that will be integrated and delivered […] Read more
Rayzon Was The Second Largest DCR Module Supplier in Residential Rooftop Solar in Gujarat Updated On Thu, Sep 29th, 2022 by Saurenergy While solar has incubated many startups, manufacturing startups are relatively rare in the sector, as manufacturing remains the toughest part of the chain. Rayzon Solar, the Gujarat based startup that started in 2017 with a 40 MW capacity has expanded to 1.5 GW since then, with plans to go all the way to 5 GW […] Read more