Explaining India’s 175 GW Renewables Target. The Big Change Making It Possible Updated On Mon, Aug 10th, 2020 by Saurenergy Over the last few months, Mr. R.K Singh, the Minister of State (Independent Charge) of the Ministry of Power, Minister of State (Independent Charge) of the Ministry of New and Renewable Energy and Minister of State in the Ministry of Skill Development and Entrepreneurship, Government of India, has faced what must seem like a tiring […] Read more
Mercedes-Benz and CATL Expand Partnership on EV Battery Technology Updated On Thu, Aug 6th, 2020 by Saurenergy Mercedes-Benz and CATL have entered the next stage of their partnership and will create cutting-edge battery technology for the German firms’ EV portfolio. Mercedes-Benz and Contemporary Amperex Technology Limited (CATL) have entered the next stage of their strategic partnership and will create cutting-edge battery technology in support of the high-volume electrification of the Mercedes-Benz model portfolio. […] Read more
Offshore Wind to Surge to 234 GW by 2030, Create 900K Jobs: GWEC Updated On Thu, Aug 6th, 2020 by Saurenergy Global offshore wind capacity will surge to over 234 GW by 2030 from 29.1 GW at the end of 2019, led by exponential growth in the Asia-Pacific region Global offshore wind capacity will surge to over 234 GW by 2030 from 29.1 GW at the end of 2019, led by exponential growth in the Asia-Pacific […] Read more
Record Low Price in Latest Onshore Wind Auction in Greece Updated On Wed, Aug 5th, 2020 by Saurenergy In its latest onshore wind auction, Greece has awarded 20-year contracts for more than 472 MW of onshore projects, including one at a new record low price. In its latest onshore wind auction, Greece has awarded 20-year contracts for more than 472 MW of onshore wind energy projects, including one at a new record low […] Read more
BCD on Chinese Imports to be Delayed by 2-3 Weeks: MNRE Updated On Wed, Aug 5th, 2020 by Saurenergy The basic customs duty (BCD) on solar imports from China, which was supposed to be implemented from August 1, 2020, will be delayed by 2-3 weeks. The basic customs duty (BCD) on solar imports from China, which was supposed to be implemented from August 1, will be delayed for another two to three weeks, per […] Read more
200 MW Harvest Ridge Wind Farm is Operational Updated On Wed, Aug 5th, 2020 by Saurenergy Walmart is one of the offtakers from the wind project EDP Renewables (EDPR), a global leader in the renewable energy sector and one of the largest wind energy producers in the world with a presence in 14 countries, has completed the construction its 200 MW Harvest Ridge wind farm in Douglas County, Illinois, USA. Through […] Read more
GE to Supply 209 MW of Wind Turbines Updated On Wed, Aug 5th, 2020 by Saurenergy GE Renewable Energy has won contracts for the construction and long-term operation of the 209 MW Murra Warra II wind farm in Victoria, Australia GE Renewable Energy selected to supply Cypress wind turbines totaling 209 MW for Murra Warra II wind farm in Victoria, Australia. Construction of the project will commence later this year and […] Read more
Voltalia Begins Setting Up 59 MW Brazil Wind Farm Updated On Wed, Aug 5th, 2020 by Saurenergy The VSM4 project is in Voltalia’s Serra Branca cluster, the world’s biggest wind-and-solar cluster Voltalia, an international player in renewable energy sector, started construction of its 59 MW VSM4 wind farm in the Serra Branca cluster, Brazil. Nordex Group is supplying the 17 wind turbines to be installed at the VSM4 site, each with a […] Read more
GERC to Amend RPO Regulations Updated On Tue, Aug 4th, 2020 by Saurenergy Changes to (Procurement of Energy from Renewable Sources) (Third Amendment) Regulations Have Been Proposed The Gujarat Electricity Regulatory Commission (GERC) has proposed changes to regulations regarding procurement of energy from renewable energy generating sources; these will be the “Third Amendments in the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010”. In the GERC proposal, […] Read more