Spruce Finance Secures $208 Million for Residential Solar Assets Updated On Thu, May 2nd, 2019 by Saurenergy Spruce Finance owns and operates a growing portfolio of distributed generation solar and residential energy assets in the U.S. Headquartered in Houston with executive offices in San Francisco. Distributed generation solar plants operator Spruce Finance, a leading owner and operator of residential energy assets in the U.S., has announced the successful closing of a $208 […] Read more
Axpo Acquires Urbasolar With Plans to Become European Leader in PV Segment Updated On Thu, May 2nd, 2019 by Saurenergy Swiss energy utility Axpo and independent French solar PV specialist Urbasolar have announced the signing of an acquisition contract of 100% of the latter’s securities by Axpo. This agreement aims to consolidate and stimulate the growth of the French PV specialist, which now becomes the photovoltaic operator within the group with the ambition to become […] Read more
Sustenance of US Coalfield Communities Hinges on Extension of Solar Tax Credit: Report Updated On Thu, May 2nd, 2019 by Saurenergy The note also adds that the issue is not restricted only to tribal lands. Many coalfield communities nationally are also struggling as coal plants and mines are retired or shut down. The federal solar tax credit should be extended by at least four years in coalfield areas, like the ones around the Navajo Generating Station […] Read more
Indian Solar Sector Contracts in 2018-19 Updated On Wed, May 1st, 2019 by Saurenergy The Indian Solar sector saw only 6,529 MW addition during the last financial year while Wind energy Sector too recorded a slump in growth. According to the data supplied by the Central Electricity Authority, 2018-19 saw fresh capacity additions to a paltry 6,529 MW as against 9,010 MW in the previous year. The figures show […] Read more
Hartek India to Supply Switchboard Panels For Rooftop Solar Projects in 20 Punjab Jails Updated On Wed, May 1st, 2019 by Saurenergy The low-voltage electrical panels to be supplied for installations to the tune of 5 megawatts (MW) would help in the optimum distribution of an estimated 60 lakh units of electricity to all the jail buildings. Hartek India, the manufacturing arm of the Hartek Group has bagged an order to supply electrical low-tension (LT) switchboard panels for […] Read more
Siemens Gamesa Wins Order For 250 MW Solar Projects From Sprng Energy Updated On Tue, Apr 30th, 2019 by Saurenergy Siemens Gamesa India has secured its largest solar energy project order of 250 MW from Sprng Energy. Siemens Gamesa India has secured its largest solar energy project order of 250 MW from Sprng Energy. According to the statement issued by the firm, the project will be developed in Anantapuram, Andhra Pradesh. Siemens Gamesa will provide […] Read more
PGCIL Floats Tender For Rooftop Solar Plants at Bhatapara Substation Updated On Tue, Apr 30th, 2019 by Saurenergy The last date for bid submission is May 28, 2019 The Power Grid Corporation of India Ltd. (PGCIL) has invited bids for the setting up of grid-interactive rooftop solar PV power plants at 400/220 KV Bhatapara Substation in Maharashtra. The total tendered capacity for projects is 220 kW, of which 60 kW will be developed […] Read more
FTC Solar “Voyager” Single-Axis Tracker Updated On Tue, Apr 30th, 2019 by Saurenergy Product Brief: FTC Solar has recently entered two markets with its single-axis tracker, the “Voyager”. The company believes the product provides industry-leading ease of installation, performance, and reliability. The product has been optimised for bifacial performance with up to 0.5% yield improvement due to less backside shading and better albedo capture. Product Features: The voyagers […] Read more
NHPC Issues Tender For Solar Projects Worth 582.16 kW in Himachal Updated On Tue, Apr 30th, 2019 by Saurenergy The last date for bid submission is May 22, 2019. NHPC Ltd. has issued a tender for the implementation of rooftop and small solar power plants of a total capacity of 582.16 kW in NHPC power stations and units at Chamera-I (155 kW), Chamera-II (230 kW), Parbati-II (125 kW), Parbati-III (72.16 kW) in Himachal Pradesh. The brief […] Read more