NTPC REL Gets Busy As MNRE Approves 4750 MW Solar Park in Gujarat Updated On Wed, Jul 14th, 2021 by Saurenergy Power Major NTPC’s renewable energy arm, NTPC Renewable Energy Limited (NTPC REL) is filling up its pipeline of projects quickly, as it will now set up India’s single-largest solar photovoltaic project at Rann of Kutch at Khavada in Gujarat, the company said on Tuesday. the announcement comes barely a month after the state owned power major […] Read more
As NIMBY Spreads To Solar In the UK, Power Roll’s Super Thin Solar Film Offers A Way Updated On Tue, Jul 13th, 2021 by Saurenergy Thin Film solar has always occupied space as a miracle solar solution, if only if it was as efficient and cheap. It seems we might be getting close to that situation soon. And driving it there is a resistance building up towards conventional ground mounted solar, as communities in the UK have resented the land […] Read more
5MW Second Phase Solar Plant Commissioned by GMR Hyderabad Airport Updated On Tue, Jul 13th, 2021 by Saurenergy GMR Hyderabad International Airport Ltd (GHIAL) said yesterday that it has commissioned the 5 MW second phase of its solar power plant, taking its total solar power capacity to 10MW. The solar plant, set up for captive consumption, is spread over an area of 45 acres and comprises over 30 thousand solar panels that have […] Read more
Draughtsman for PV Solar Project – Electrical (m/f/d) Updated On Mon, Jul 12th, 2021 by Saurenergy Assemble documents packages and develop drawing sets to be reviewed by engineer. Ensure to quantify factors affecting arrangement and installation of equipment and components. Preparation of in-house drawings and explain prepared drawings. Visit proposed installation sites and draw rough sketches. Preparation of As-built drawings precisely. Quick response to the team and able to amend/modify drawings. […] Read more
Electrical Engineer – Power System Updated On Mon, Jul 12th, 2021 by Saurenergy Responsibilities:- Knowledge of power system engineering and grid integration of conventional and non-conventional generators. Experience in steady-state and dynamic studies using industry-standard platforms such as PSSE & Power Factory. Ability to analyse and interpret the major assets data received from the customer and OEM. Evaluate options, write clear and concise reports; and present study results […] Read more
SECI Issues Tender for 100 MW Solar Plant in Chhattisgarh Updated On Mon, Jul 12th, 2021 by Saurenergy The Solar Energy Corporation of India (SECI) on Friday (July 9) released a tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Solar PV Project with Land having 15 years Plant O&M At Chhattisgarh. SECI had earlier issued a tender for land parcels in the state for 100 MW […] Read more
Power Equipment Major Alfanar Acquires Wind Energy OEM Senvion India Updated On Thu, Jul 8th, 2021 by Saurenergy Saudi power equipment major Alfanar has made a formal entry into India’s energy sector through its 100% acquisition of wind turbine OEM Senvion India from Senvion GmbH. The acquisition was made through Global Renewable Energy Development Holding Company Limited (GREDHCL), a dedicated investment vehicle set-up by promoters of Alfanar. Announced back in December 2020, the […] Read more
Local Firm to Set Up 100 MW Solar Plant in Botswana Updated On Thu, Jul 8th, 2021 by Saurenergy The Botswana energy regulator has granted a generation licence for a 100 MW solar project to local firm Shumba Energy, making it the first independent power producer to set up a large scale solar plant in the country, according to media reports. This landlocked country in Southern Africa does not currently have large scale solar […] Read more
Residential Rooftop Solar To Cost Rs 31,200/Kw In Andhra Pradesh after Subsidy Updated On Tue, Jul 6th, 2021 by Saurenergy The Andhra Pradesh Eastern Power Distribution Corporation Limited (APEPDCL) has discovered the lowest bid of Rs. 50,000/kW for up to 1 kW of residential rooftop solar systems. That means, after central subsidies, it would cost only Rs. 31,200 to consumers. Interestingly, for larger 100Kw to 500Kw sizes, the discovered price is Rs 36,000/Kw , though […] Read more