Adani Power Debuts In Middle East, Sets Up Subsidiary At Abu Dhabi Updated On Tue, Aug 27th, 2024 by Saurenergy Adani Power Limited has established a new wholly-owned subsidiary, Adani Power Middle East Ltd., in Abu Dhabi, United Arab Emirates, following its expansion into Singapore. The company informed the exchange that Adani Power Middle East Ltd. will focus on investments in power, infrastructure, and related industries. The subsidiary has an authorized share capital of $27,000, […] Read more
Falling Solar, Wind Tariffs Threaten SJVN’s Core Hydro Projects Updated On Mon, Aug 26th, 2024 by Saurenergy The lower tariffs offered by solar and wind projects in India seem to have dented the avenues of SJVN’s pet hydroelectric power projects. The top management of the company has also taken an account of the same in its latest Annual Report for the last fiscal. In the pursuit of expanding its footprint in the […] Read more
China Blows Past 2030 Target For Solar, Wind Updated On Mon, Aug 26th, 2024 by Saurenergy Back in 2020, Chinese President Xi Jining had outlined a plan to be carbon neutral by 2060, achieve peak emissions by 2030, and in doing so, add 1200 GW of solar and wind capacity by 2030. Low Prices Drive Faster Adoption As it turns out, the Chinese might have surprised even themselves considering how quickly […] Read more
SECI Seeks 800 Acres Of Land For 200 MW Solar Project In MP Updated On Fri, Aug 23rd, 2024 by Saurenergy Solar Energy Corporation of India (SECI) recently released a tender for the selection of an agency for the outright purchase or lease of 800 acres of land for the development of a 200 MW solar project in Madhya Pradesh with September 23 as the last date for bids submission. The SECI tender states that for […] Read more
O&M Manager (Solar and Wind Turbine) Updated On Fri, Aug 23rd, 2024 by Saurenergy We are seeking an experienced Operations and Maintenance (O&M) Manager who will be responsible for overseeing the efficient operation and maintenance of solar, wind turbine and BESS installations across multiple locations. The ideal candidate will have extensive experience in managing outsourced renewable energy O&M jobs, particularly in managing both solar and wind assets. This role […] Read more
UPNEDA Amends Tender For Solar-Based Water Kiosks Updated On Thu, Aug 22nd, 2024 by Saurenergy The Uttar Pradesh New and Renewable Development Agency (UPNEDA) has now amended its earlier tender, seeking developers for solar-based drinking water kiosks. The new corrigendum issued by the state nodal agency attempts to amend the clause related to the eligibility of the bidders. The earlier tender document had mandated that the bidders must have installed […] Read more
IIT Bhubaneswar Develops Solar-Powered Reactor For Waste Management Updated On Thu, Aug 22nd, 2024 by Saurenergy A research team from the School of Infrastructure at the Indian Institute of Technology (IIT) Bhubaneswar has developed a solar-powered microwave pyrolysis reactor. This reactor is designed to recover valuable resources from both segregated and mixed waste materials, including biomass and plastics. The reactor uses microwave-assisted pyrolysis to rapidly convert waste into products such as […] Read more
Assistant Manager- Solar O&M Updated On Wed, Aug 21st, 2024 by Saurenergy Should have sound knowledge on basic principles of Electrical Components. Preparation of various documents as per ISO standards. Experience in problem solving by using tools like Root Cause Analysis, Corrective Action & Preventive Action process. Raising Non-Conformities, conducting RCA, CAPA and tracking closure of NCs for timely completion. Supervising and verifying preventive maintenance as per […] Read more
Ciel & Terre India Completes 4.096 MWp Floating Solar Installation For Amplus Updated On Tue, Aug 20th, 2024 by Saurenergy Ciel et Terre India has delivered an innovative floating solar plant to Amplus KN One Power. Project Overview The Amplus KN One Power project is located within the premises of UltraTech Cement Limited (UTCL) at UTCL Awarpur in Maharashtra. Completed within 4 months, the project has used some innovative approaches to overcome the many challenges it […] Read more