Engineer- Controls III Updated On Tue, Jul 5th, 2022 by Saurenergy Requires to take a lead role in the global implementation and development of electrical controls systems/designs, PLC/HMI programing, perform vendor equipment check-out, equipment/system start-ups, data collection and optimization of control systems. Mentors junior engineer on control systems troubleshooting in manufacturing environment. Primary Responsibilities:- Responsible for maintaining and updating of manufacturing process tool electrical drawings globally, […] Read more
JSW Steel Pledges Rs 10,000 cr For Renewable Energy Investments Updated On Mon, Jul 4th, 2022 by Saurenergy JSW Group Chairman Sajjan Jindal has made a strong pitch for going green in it’s 2021-22 annual report. With an aim to reduce the carbon footprint of its operations and reduce dependence on coal based power, Jindal said that the company will be investing Rs 10,000 crore to increase it’s use of renewable energy. The […] Read more
CERC Allows ACME Petition To Qualify Entry Tax As Change In Law Updated On Fri, Jul 1st, 2022 by Saurenergy The Central Electricity Regulatory Commission allowed on June 29 the petition moved by ACME praying for declaring the Entry Tax as Change In Law defined in the statutes. The three judges panel of I. S. Jha, Arun Goyal and P. K. Singh, also ordered the stay of collection of entry tax pursuant from the petitioner […] Read more
Engineer- Operations I Updated On Thu, Jun 30th, 2022 by Saurenergy The incumbent shall drive activities of the department for process improvement. He shall look in depth in process related issues and coordinate the activities towards understanding and resolution of such issues. Technical coach. Basic Job Functions:- The incumbent shall drive activities of the department for process improvement. He shall look in depth in process related […] Read more
Engineer- Manufacturing I Updated On Thu, Jun 30th, 2022 by Saurenergy Primary accountability of the Process Integration Engineer is to sustain the product performance for key manufacturing metrics (Yield, Module Efficiency, Reliability and Durability, Cost), and transfer new technology from pilot line to satellite sites. Essential Functions & Responsibilities:- Participate/lead in technology start-up, transfer, and ramp activities from development site to meet yield, reliability, cost, and […] Read more
KPI Green Energy Completes Installation of 10 MWp Updated On Tue, Jun 28th, 2022 by Saurenergy KPI Green Energy Limited, the solar vertical of KP Group and a prominent Gujarat based solar power generating company, has installed 10MWp solar projects at Bharuch Gujarat. It’s a CPP project developed by KPI Green Energy on behalf of CPP customer by entering into a turnkey agreement enabling CPP customer to not only use a […] Read more
Solis Seminar On The Importance of Using Photovoltaic Cables in Photovoltaic Systems Updated On Tue, Jun 28th, 2022 by Saurenergy Background In some photovoltaic power plant projects, ordinary cables have been used in replacement of dedicated photovoltaic cables, which can provide lower installation costs. This approach puts the entire solar PV system at risk and is dangerous. In this Solis seminar we introduce the differences between photovoltaic cables and ordinary cables, and the importance of […] Read more
Airports To Become Carbon Neutral By December 2024 Updated On Wed, Jun 15th, 2022 by Saurenergy The government is aiming to make Most Indian airports carbon neutral by December 2024 and achieve Net Zero emissions by 2030. Rubina Ali, joint secretary, Ministry of Civil Aviation, recently wrote to the CEOs of the private airports and the Airports Authority of India (AAI) to submit a plan to achieve net zero. Her letter […] Read more
Engineer- Wastewater and Recycling III Updated On Tue, Jun 14th, 2022 by Saurenergy Responsible for implementation of Ultra-Pure Water Plants (UPW), Wastewater Treatment Plants (WWTP), Zero-Liquid-Discharge system (ZLD), Solar panel Recycling system(RCY) and Centralize Waste Management (CWM) systems as directed by the Manager. Post project completion the primary responsibility of this job is to manage process performances of Ultra-Pure Water, Wastewater Zero Liquid Discharge facility including sludge handling systems, […] Read more