Rourkela Steel Plant Develops 1MW Solar Plant Updated On Tue, Dec 8th, 2015 by Saurenergy Inside the premises of Rourkela Steel Plant (RSP), a unit of SAIL Ltd is known to have installed a 1 MW solar photovoltaic (PV) power generation unit, of Rs 6.68 crore. The framework, which is in the last phase of commissioning, is relied upon to produce minimum of 1.479 million units of solar energy per […] Read more
Consolation to Domestic Households for Installation of Solar Panels-MNRE Updated On Tue, Dec 8th, 2015 by Saurenergy India Government has set an objective for establishment of 100 GW Solar based power plant by the year 2022. This was expressed by, Shri Piyush Goyal Minister of State (IC) for Power, Coal and New and Renewable Energy in a composed answer to a question in the Rajya Sabha. The Legislature has found a way […] Read more
Solar Energy Prime for Green India – MNRE nudge Eminent Initiatives Updated On Sat, Dec 5th, 2015 by Saurenergy In the financial plan of 2015, Govt of India aims to swell 175GW of renewable energy, including a pragmatic extension of 100GW of renewable energy by 2022 said Shri Piyush Goyal, Minister of State (IC) for Power, Coal & New and Renewable Energy during a questionnaire session in the Lok Sabha. The minister also cites […] Read more
India, France Jaws on Solar Energy Alliance Updated On Tue, Dec 1st, 2015 by Saurenergy Prime Minister Narendra Modi and French President Francois Hollanden are launching an International Solar Alliance, target to bring up clean and affordable solar energy within the reach of all. The launch of International Solar Alliance will coincide with the 12 days world leaders’ conference of climate changes in Paris, to seek new global deals on […] Read more
CIAL Twofold Solar Energy Capacity Updated On Sat, Nov 28th, 2015 by Saurenergy The Cochin International Airport Limited (CIAL) has decided to upgrade its solar energy generation capacity from the existing 13.1 MW because of the rising energy needs. The decision was afoot at a meeting of The Board of Directors of CIAL. In 18th August 2015, solar power project installed the capacity of 13.1MW power plant which […] Read more
Consultant – Supply Chain Business Systems Updated On Fri, Sep 27th, 2024 by Saurenergy The Consultant – Supply Chain Business Systems role will be based in Hyderabad, NEXTracker office. In this position, you will report to the Senior Manager – Supply Chain Program Management The consultant will be leading and managing all business system related tasks for the New Product Introduction (NPI) team Work with the New Product Introduction (NPI) […] Read more
Manufacturing Process Engineer – Mechanical Updated On Fri, Sep 27th, 2024 by Saurenergy Here is the key role of what you will do… Collaborate with R&D teams to manage transfer from prototype to mass production. Partner with external suppliers to document and analyze manufacturing processes for mechanical and motion control products. Identify and implement critical to quality (CTQ) characteristics and create control plans to ensure product quality […] Read more
GERC Reaffirms Right Of Developers To Replace Damaged Modules Updated On Fri, Sep 27th, 2024 by Saurenergy The Gujarat Electricity Regulatory Commission (GERC) in its latest order said that the solar generators are entitled to replace their older damaged solar panels with new modules by abiding with the committed CUF (Capacity Utilisation Factor). The order of the state power regulator came to the light while hearing a petition of solar power generator […] Read more
Jio-bp Reaches 5000 Charging Points Milestone with 500th Station In Mumbai Updated On Thu, Sep 26th, 2024 by Saurenergy Anant Mukesh Ambani, Director, Reliance Industries Limited (RIL) and Murray Auchincloss, CEO, bp inaugurated the 500th Jio-bp pulse EV-charging station of Jio-bp, a fuels and mobility joint venture between RIL and bp. The commissioning of the EV-charging station enables access for guests at the Nita Mukesh Ambani Cultural Centre, Jio World Plaza and Jio World […] Read more