NISE to Conduct Three Day Skill Development Program on Solar PV System Design Using PVSYST & PVSOL Software Updated On Mon, May 1st, 2017 by Saurenergy The Three Day Skill Development Program from NISE will focus on Solar PV System Design Using “PVSYST & PVSOL” simulation software and understand an off- grid system, on- grid system and hybrid system. National Institute of Solar Energy (NISE) is conducting its 11th Three Day Skill Development Program on Solar PV System Design Using “PVSYST […] Read more
VIZ-A-VIZ with S.K Mahajan, Director, IB Solar Updated On Sun, Apr 30th, 2017 by Saurenergy Q. Kindly slate on the journey of the company so far. The business was founded in 1992 with a mere capital of Rs. 2000; my father was a retired government officer then. I have 16 years of experience with corporate industry before starting business under the name Integrated Marketing, which became Integrated Batteries India Pvt. Ltd. […] Read more
Chinese Solar Equipment Major, GCL-Poly Energy Bids on India Solar Market Updated On Sun, Apr 30th, 2017 by Saurenergy The Chinese solar equipment maker major, GCL-Poly Energy Holdings has shared plans to invest in India, attracted by the nation’s emerging green economy. As part of its India entry plan, GCL-Poly Energy Holdings Ltd is in talk with Subhash Chandra’s Essel Group to set up a solar module manufacturing facility. The Hong Kong-listed firm, which […] Read more
REPORT ON THE 11TH SNEC PV POWER EXPO Updated On Sat, Apr 29th, 2017 by Saurenergy SNEC2017, with the exhibiting space reaching 180,000 square meters, attracted over 1,800 exhibitors and over 220,000 visits from 95 countries and regions The 11th SNEC PV POWER EXPO Successfully Held The largest PV tradeshow in the world — SNEC 11th (2017) International Photovoltaic Power Generation Conference & Exhibition was successfully rounded off on April 21st, 2017. […] Read more
Azure Power and Hareon Solar Forms Joint Venture to Develop 118 Mw Solar Power Project in Telangana Updated On Fri, Apr 28th, 2017 by Saurenergy Hareon Power Singapore Limited, the Singapore subsidiary of Hareon Solar will be collobarating with Azure Power to develop 118 MW solar power project in Telangana. Hareon Solar Technology Co., Ltd. will be partnering with Azure Power Global Limited to develop a 118 MW solar power project in India. Hareon will be investing through its Singapore […] Read more
Kerala Solar Energy Policy Updated On Thu, Apr 27th, 2017 by Saurenergy OBJECTIVE Objective of the state solar policy include:- Increase the installed capacity of the solar sector in the State to 500MW by 2017 and 2500 MW by 2030. Contribute to long term energy security of the State of Kerala as well as ecological security by reduction in carbon emission. Adopt a multi-pronged approach in targeting […] Read more
Jharkhand Solar Energy Policy Updated On Thu, Apr 27th, 2017 by Saurenergy Jharkhand Solar Energy Policy Updates 2017 A 50 percent subsidy to residential consumers and a 10 percent subsidy to commercial (industrial) consumers installing rooftop solar will be provided by the Jharkhand State government, the policy was implemented in July 2017. OBJECTIVE The objectives of the Policy are as follows To encourage participation of private sector […] Read more
Haryana Solar Energy Policy Updated On Thu, Apr 27th, 2017 by Saurenergy Haryana Solar Energy Policy Updates 2017 A discussion paper was released by the Haryana Electricity Regulatory Commission (HERC) in July 2017, stating Terms and Conditions for Determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation (RPO) and Renewable Energy Certificate (REC)) Regulations, 2017. The draft mentioned the useful life for solar power projects determined […] Read more
Jammu and Kashmir Solar Energy Policy Updated On Thu, Apr 27th, 2017 by Saurenergy Jammu and Kashmir Solar Energy Policy Updates 2017 The solar rooftop projects aggregating 450MW will be installed in the state by 2022 has been approved by the state cabinet of Jammu & Kashmir as per the solar rooftop policy 2016 to be followed for a 10-year period implemented in accordance with the provisions of Jammu […] Read more