Module Scarcity Delaying Solar Projects In India, Hints NLC India Updated On Mon, Mar 3rd, 2025 by Saurenergy Indian Public Sector Utility (PSU), NLC India has hinted that the delay in the supply of domestic solar modules in the country is leading to delays in solar projects. The top management of the firm in a recent investor’s call revealed that the demand for domestic modules has led to a shortage of timely delivery […] Read more
Bihar Issues Tender To Build 116 MW Solar Project With 50.5 MW BESS Updated On Mon, Mar 3rd, 2025 by Saurenergy The Chief Engineer (Generation) of Bihar State Power Generation Company has issued an e-tender to select an EPC contractor for the development of a 116 MW (AC) solar project integrated with a 50.5 MW, 4-hour Battery Energy Storage System (BESS) (minimum 241 MWh capacity). The tender specifies that online submission will commence on March 19, […] Read more
MNRE Minister launches First AI Powered Solar Line At Goldi Solar Updated On Mon, Mar 3rd, 2025 by Saurenergy Union MNRE minister Pralhad Joshi, has launched India’s first AI-powered solar manufacturing line at Goldi Solar’s newly built, state-of-the-art facility in Kosamba, Surat, Gujarat. This achievement marks a major leap in India’s renewable energy sector, integrating cutting-edge AI-driven processes to revolutionize solar PV module production. The AI-powered facility enhances precision, scalability, and efficiency in solar […] Read more
Customer Service To Forefront As India’s Solar Boom Spreads Updated On Mon, Mar 3rd, 2025 by Saurenergy India’s solar ambitions are on a roll, and that’s visible in more ways than one. More and more solar installations are popping up if you look up from your phone around you, the number of solar firms listed on stock exchanges has gone up exponentially within two years, and of course, celebrities and influencers can […] Read more
L&T Bags Power Transmission & Distribution Order In Uttar Pradesh Updated On Mon, Mar 3rd, 2025 by Saurenergy The Power Transmission & Distribution (PT&D) division of Larsen & Toubro (L&T) has secured new orders both in India and internationally. In India, it has been awarded a contract to implement 765kV and 400kV transmission line segments associated with a Renewable Energy Zone in Uttar Pradesh (UP). Before this, the company won an order for […] Read more
MSEDCL Has Early Win in 2025 With 100 Day Solar Rooftop target Achieved Updated On Mon, Mar 3rd, 2025 by Saurenergy Maharashtra State Electricity Distribution Company Ltd (MSEDCL), the key Maharashtra discom outside Mumbai, enjoyed a rare renewable win with the achievement of its 100 day target for solar rooftops in Nagpur met in 82 days. The gains were largely the result of the PM Suryaghar rooftop scheme, with more than 1.5 lakh beneficiaries opting for […] Read more
Junior Engineer – Civil (Solar EPC) Updated On Fri, Feb 28th, 2025 by Saurenergy Responsibilities:- Site Supervision & Execution:- Assist in civil construction activities for solar power plants, including foundation works, roads, drainage, and fencing. Support land grading, excavation, and site leveling based on project Supervise pile foundations, RCC structures, and mounting system installations. Ensure adherence to construction schedules and quality standards. Coordination & Quality Control:- Work closely with […] Read more
Adani Fast-Tracks Khava RE Project, Commissions 275 MW Solar Project Updated On Fri, Feb 28th, 2025 by Saurenergy Adani Green Energy Twenty Five A Limited, a subsidiary of the Adani Green Energy, operationalized an incremental 275 MW of solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 12,258.1 MW.” The commissioning follows a 250 MW […] Read more
Adani Green Operationalize 67 MW Solar project At Khavda, Gujarat Updated On Tue, Feb 25th, 2025 by Saurenergy Adani Green Energy Twenty Six B Limited, a wholly owned step-down subsidiary of Adani Green, has operationalized a 67 MW solar power project at Khavda, Gujarat. The company said in a regulatory filing, “With the commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 11,983.1 MW.” Projects In Khavda On The […] Read more