Chinese Researchers Make Progress With Hydrogen Solar Project, Liquid Sunshine Updated On Tue, Nov 17th, 2020 by Saurenergy China, which announced a net zero emissions target of 2060, has no intentions of falling behind in the next frontier of the renewables race, especially the race to produce Hydrogen using solar power. Solar powered ‘green’ hydrogen production, which has been a key focus area for many regions especially the European community area, Australia and […] Read more
Railways Runs Into A Red Signal For 1 GW Solar Tender Updated On Mon, Nov 16th, 2020 by Saurenergy The Railway Energy Management Company Limited (REMCL)’s tender for a 1GW of solar plants on railway land available close to railway tracks has run into a wall of disinterest from solar developers. The tender, with deadline of September 2, was a detailed one that included the design, build, finance, operation, long– term maintenance and transfer […] Read more
KSEB Finally Closes 200 MW Solar Tender At Rs 2.97/unit, NTPC, Tata Power Winners Updated On Fri, Nov 13th, 2020 by Saurenergy The Kerala state Electricity Board (KSEB), after a nearly year long struggle, has finally reached closure on its quest for 200MW solar power for the state, though the final reported price, Rs 2.97.unit , may not exactly be what they had hoped for. Keep in mind that the board had failed to convince NHPC to […] Read more
Tender Issued for 50 MW Off-Grid Solar Plants in Meghalaya Updated On Thu, Nov 12th, 2020 by Saurenergy MePDCL has issued a tender for the installation of aggregated 50 MWp off-grid Solar Power Plants in different locations in the state of Meghalaya. The Meghalaya Power Distribution Corporation Limited (MePDCL) has proposed the design, supply, installation, testing, commissioning, operation & maintenance in RESCO Model of an aggregate of 50 MWp off-Grid solar SPV power […] Read more
MePCDL issues EoI Tender for 10MW Solar Plant in Meghalaya Updated On Thu, Nov 12th, 2020 by Saurenergy MePDCL has issued an EoI for the installation of Decentralized Grid Connected Ground/ Stilt Mounted Solar Based Power Plants in Meghalaya Meghalaya Power Distribution Corporation Limited (MePDCL) has issued an expression of interest (EoI) in the installation of Decentralized Grid Connected Ground/ Stilt Mounted Solar Based Power Plants of capacity 500 KW to 2 MW […] Read more
Solar Plants, Batteries Among 10 Sectors In Expanded PLI Scheme Updated On Wed, Nov 11th, 2020 by Saurenergy The Union Cabinet has approved the Production Linked Incentive (PLI) Scheme for 10 “key sectors”, including telecom, electronics, solar PV and batteries. With this move, the government has delivered on its promise to encourage manufacturing with direct interventions, especially for the solar PV manufacturing. The battery sector, or advanced chemistry cell (battery) as the government […] Read more
New Solar Energy Plan for Bangladesh Provides Solutions for Energy Security, Rising Costs Updated On Wed, Nov 11th, 2020 by Saurenergy A shift in focus to renewables would help to reduce the need for power subsidies or tariff increases A new National Solar Energy Action Plan that has reportedly been drafted by SREDA – the Sustainable and Renewable Energy Development Authority – could be a significant and timely turnaround in Bangladesh’s renewable energy ambition. The report is coming […] Read more
Azure Power Posts Q2 2020 Financial Results Updated On Wed, Nov 11th, 2020 by Saurenergy Azure Power Global Limited, India’s only solar power producer listed in the US markets, has announced its consolidated results under the United States GAAP for the fiscal second quarter 2021, period ended September 30, 2020. Fiscal Second Quarter 2021 Period Ended September 30, 2020, Operating Highlights: • Operating Megawatts (“MW”) were 1,834 MWs, as of September 30, […] Read more
NTPC Brings Online First 8 MW Part of 20 MW Auraiya Solar Project Updated On Wed, Nov 11th, 2020 by Saurenergy NTPC has begun commercial operation of the first part worth 8 MW capacity of the 20 MW Auraiya Solar PV Project in UP. NTPC Ltd has announced that upon successful commissioning, it has begun commercial operation of the first part worth 8 MW capacity of the 20 MW Auraiya Solar PV Project at Auraiya, UP. […] Read more