Trade-led Solar PV Deployment Likely to Create 40 M Jobs by 2050: Study Updated On Mon, Aug 2nd, 2021 by Saurenergy A new joint report by International Renewable Energy Association (IRENA) and World Trade Organisation (WTO) examines how trade policies can support cost reductions, deployment of components & job creation in the solar PV sector. The report entitled “Trading into a Bright Energy Future: The Case for Open, High-quality Solar Photovoltaic Markets” finds, among other things, that trade-led solar […] Read more
REC Limited Issues 125 MW Solar tender for Uttar Pradesh Districts Updated On Fri, Jul 30th, 2021 by Saurenergy REC power Distribution company Limited (RECPDEL), a subsidiary company of REC Limited has issued a notice or two solar projects in UP’s Kanpur Dehat and Jalaun District, for solar projects. The size of the solar projects has been pegged at 50 MW ac for Kanpur and 75 MW ac for Jalaun. The location f the […] Read more
Floating Solar On A Growth Path Updated On Thu, Jul 29th, 2021 by Saurenergy In Solar’s rise to pre-eminence from a fringe renewable energy option just a decade back, it’s time to consider the rise of floating solar (also called floatovoltaics in many cases). To think that it did not even exist at any scale till 2013. The earliest patent on floating solar was taken out only in 2008. […] Read more
Auto Major Mahindra & Mahindra Sets Up 58 MWp Captive Solar Plant Updated On Thu, Jul 29th, 2021 by Saurenergy Mumbai-headquartered auto major Mahindra & Mahindra Ltd. is adopting a 58 MWp captive solar plant that is expected to generate about 100 million units of power annually beginning 2022. Located in Parbhani district in the Marathwada region of Maharashtra, the solar plant will be built, owned, and operated for a period of 25 years by […] Read more
Power Minister Highlights Steps Taken to Push 4000 MW Rooftop By 2022 Updated On Wed, Jul 28th, 2021 by Saurenergy Responding to a query in the Rajya Sabha, the Ministry of New and Renewable Energy is implementing Rooftop Solar Programme Phase II wherein grid connected RTS capacity aggregating 4000 MW by 2022 is targeted for installation in residential sector with provision of subsidy. For individual households, subsidy upto 40% of the benchmark cost is provided […] Read more
ST’s Bouskoura Plant to Use 50% Energy from Renewables by 2022 Updated On Wed, Jul 28th, 2021 by Saurenergy French-Italian semiconductor manufacturing company STMicroelectronics has announced that its Bouskoura site in Morocco will procure 50% of its energy from renewable sources by 2022 compared to 1% in 2020, as part of its action plan to achieve carbon-neutrality by 2027. ST has been present in Bouskoura for over 20 years with a back-end plant which employs […] Read more
With India’s Renewable Power Capacity Battle Won, Is It Time To Focus On Generation? Updated On Wed, Jul 28th, 2021 by Saurenergy In response to a query in the ongoing monsoon session of parliament, Power and MNRE Minister R.K. Singh informed the house that India’s renewable energy capacity, including installed, under installation and being tied up, stands at almost 97 GW as of June 30, 2021. This mix includes solar, wind, biomass and small hydel. Add to […] Read more
John Cockerill to Supply Thermal Receivers to Redstone CSP Plant in SA Updated On Tue, Jul 27th, 2021 by Saurenergy John Cockerill, a Belgium-based engineering company, has revealed that it will supply molten salt solar thermal receivers to Redstone’s 100 MW Concentrated Solar Power Plant (CSP) in the Northern Cape Province of South Africa. Developed by Saudi Arabia-based ACWA Power and constructed by EPC SepcoIII, the Redstone CSP plant is expected to supply 2,00,000 households […] Read more
CERC Sticks To The Letter In PGCIL Tiff With Renew Power Updated On Tue, Jul 27th, 2021 by Saurenergy The Central Electricity Regulatory Commission (CERC) has stuck to the letter of the law, rather than going with the spirit perhaps, in a ruling involving wind developers and a power grid corporation. Renew Power Private Limited obtained Stage-II connectivity for 300 MW at 220 kV Hiriyur sub-station, on the basis of National Thermal Power Corporation […] Read more