IRCON Renewable Issues Tender for Solar Power Projects for Karnataka Updated On Mon, Sep 5th, 2022 by Saurenergy IRCON Renewable Power (IRPL) has floated a tender for the supply of 500 MW of solar power projects at Pavagada in Karnataka. The last date for submitting the online bid is September 16, 2022, and the bids will be opened on September 17, 2022. As per the tender document, the completion period of this solar […] Read more
Bangladesh Operationalises 30 MW Solar Power Project in Pabna Updated On Fri, Sep 2nd, 2022 by Saurenergy Giving a reasonable push to the renewable energy development in the country, the Bangladesh Power Development Board (BPDB) has revealed in a filing before Dhaka Stock Exchange that a solar power project with a capacity of 30 MW is operationalised in the northern region of Bangladesh. Intraco Solar Power Ltd. (ISPL) has developed the said […] Read more
First Project With Modules From Credence Solar Nears Launch Updated On Fri, Sep 2nd, 2022 by Saurenergy Yet another Gujarat-based firm has embarked on its solar journey. The latest entrant is Rajkot-based Credence Solar Panels Private Limited, a solar panel manufacture with production capacity of 200MW equipped with most modern manufacturing machinery capable of M10 and M12, (540 to 670W in mono and Bifacial) which are now certified and approved by BIS […] Read more
Botswana Power Corporation Awards Scatec ASA First Large Scale Solar Contract Updated On Fri, Sep 2nd, 2022 by Saurenergy Norway-based renewable energy leader Scatec has said that it has signed a binding 25-year power purchase agreement (PPA) with and the Botswana Power Corporation (BPC) for the construction of a solar PV facility with a contracted capacity of 50 megawatt. The solar facility will be set up in Selibe Phikwe, a former mining town located […] Read more
GSECL Invites Bids for 30 MW Grid-Connected Solar Projects in Gujarat Updated On Fri, Sep 2nd, 2022 by Saurenergy Gujarat State Electricity Corporation Limited (GSECL) has floated three tenders to establish three solar power plants in three different locations in Gujarat with a cumulative capacity of 30 MW grid-connected solar. Each plant will be of 10 MW of capacity. The projects will be implemented in Amreli, Surendranagar, and Rajkot. The last date for submitting […] Read more
NTPC Trading Arm Invites EOI For RTC Green Power Updated On Fri, Sep 2nd, 2022 by Saurenergy NTPC Vidyut Vyapar Nigam Limited, a power trading subsidiary of NTPC Limited, has invited expressions of interest from renewable energy developers for round the clock (RTC) power supply for the medium to long term. The latest tender indicates the pace at which demand for green RTC power is going up, as utilities look to ensure […] Read more
The Bridge to 280 GW Of Solar. Corporate India Steps Up Updated On Thu, Sep 1st, 2022 by Saurenergy They have the money, resilience, and execution ability that can leave an indelible impact on India’s economy; but can the country’s corporates (C&I sector) open up a new growth engine for India’s solar movement? The time, it seems, has arrived. As always in India, among the stakeholders, there will be many who will want to […] Read more
Keppel To Develop Singapore’s First Hydrogen-Ready Power Plant, Awards Consortium for Construction Updated On Thu, Sep 1st, 2022 by Saurenergy Keppel Infrastructure Holdings Limited, through its wholly owned subsidiary Keppel Energy, has reached final investment decision (FID) to develop a 600MW state-of-the-art, advanced combined cycle gas turbine (CCGT) power plant in Singapore. This will be Singapore’s first hydrogen-ready CCGT power plant. Keppel has also awarded an engineering, procurement and construction (EPC) contract to a consortium […] Read more
MAHAGENCO Invites EOI for 600 MW Solar Projects in Maharashtra Updated On Tue, Aug 30th, 2022 by Saurenergy Under the “Mukhyamantri Saur Krishi Vahini Yojna,” the Maharashtra State Power Generation Company (MAHAGENCO) has invited an Expression of Interest to establish six solar power plants in six different regions of Maharashtra with a cumulative capecity of 600 MW. Each plant has 100 MW of capacity. The projects will be implemented in Nagpur, Amravati, Aurangabad, […] Read more