Growatt Powers Commercial Solar Installation in Gujarat Updated On Mon, Jan 15th, 2024 by Saurenergy Solar inverter company Growatt unveiled a 735 kW solar project in India. This project forms a part in the renewable energy blueprint of Supreme Industries, India’s largest plastic production and processing company. Commissioned in collaboration with the installer Kalpa Power and powered by Growatt’s MAX and MAC series inverters, this project ensures peak performance, safety, […] Read more
Avaada To Develop 6 GW Hybrid Wind-Solar Projects In Gujarat Updated On Mon, Jan 15th, 2024 by Saurenergy Avaada Group recently signed a Memorandum of Understanding (MoU) with the Gujarat government. Per the agreement, the cleantech company aims to set up hybrid wind-solar projects with an aggregate 6000 MW (6 GW) capacity in the coastal state. It has also planned an investment of about Rs 40,000 crore. The agreement between Avaada and the […] Read more
36 Municipal Schools in Mira Bhayandar to be solarised by MBMC Updated On Mon, Jan 15th, 2024 by Saurenergy The Mira Bhayandar Municipal Corporation (MBMC), Thane, is taking significant steps to enhance energy efficiency by initiating the installation of rooftop solar plants across all municipal schools in the twin-city. Currently, there are 17 structures accommodating 36 municipal schools run by MBMC. The estimated cost of the solar power project is Rs. 50 lakh, with […] Read more
NHPC Seeks EoI For India’s First Off-Shore Wind Power Project Updated On Mon, Jan 15th, 2024 by Saurenergy The National Hydroelectric Power Corporation (NHPC Ltd) has issued an Expression of Interest (EoI) to attract global entities for the establishment of India’s inaugural offshore wind energy plant. This initiative aligns with NHPC’s broader strategy of achieving over 27 GW in renewable energy projects by 2030, supporting India’s climate objectives for the same year. The […] Read more
MNRE Simplifies Rooftop Solar Installation Process, Issues New Notification Updated On Fri, Jan 12th, 2024 by Saurenergy In the latest notification, the Ministry of New and Renewable Energy (MNRE) tried to simplify the application process for grid-connected rooftop solar. The latest notification issued by the ministry has asked the discoms to ask their consumers for fewer documents to install rooftop solar. Meanwhile, the ministry has also listed the documents needed to be […] Read more
Director (Power System) Updated On Fri, Jan 12th, 2024 by Saurenergy I. COMPANY PROFILE:- Solar Energy Corporation of India (hereinafter referred to as SECI) is a schedule ‘A’ CPSE under the Administrative jurisdiction of Ministry of New & Renewable Energy. SECI is the only CPSE exclusively dedicated to the development of the Renewable Energy sector in India and its scope of activities covers all renewable energy […] Read more
Solar Site Engineer Updated On Fri, Jan 12th, 2024 by Saurenergy As a Site Engineer at Voltstar Solar, you will be responsible for: Manpower and time management to complete project on time. Ensure all the safety policies are followed on project and apply on the team Provide technical direction or support to installation teams. Planning and ensuring all electrical installations as per approved drawing and material […] Read more
Indian Railways Floats RTC Tender For 695MW Of Renewable Power Updated On Thu, Jan 11th, 2024 by Saurenergy The Indian Railways has now floated a tender, seeking developers to supply 695 MW of Round-the-Clock (RTC) power from grid-connected Renewable Energy. The Railway Energy Management Company Limited floated the tender on behalf of the Indian Railways. “REMC Ltd., for and on behalf of Indian Railways, invites bid in single stage two packet system for […] Read more
NHPC Awards 250MW Rajasthan Solar Project To Apraava Energy Updated On Thu, Jan 11th, 2024 by Saurenergy The National Hydroelectric Power Corporation (NHPC) awarded a 250 MW Inter-State Transmission System (ISTS) connected solar energy project in Rajasthan to Apraava Energy. Apraava Energy, an integrated energy solutions provider, announced receiving the order today. The project order through the e-reverse auction mechanism at a walk-out tariff of INR 2.53 per kWh is scheduled to be completed within […] Read more