NTPC Floats Tender for 90 MW BOS Package for Anta Solar Project Updated On Thu, Oct 24th, 2019 by Saurenergy NTPC has issued a tender for the development of a 90 MW BOS package for the Anta Solar Power Project in Rajasthan. NTPC has issued a tender, inviting bids from eligible parties for the development of 90 MW Balance of System (BOS) package for Anta Solar Power Project in Rajasthan. The scope of work (SOW) […] Read more
Sanjeev Nandan Sahai Appointed to Chair Power Secretary Updated On Wed, Oct 23rd, 2019 by Saurenergy As per the order of the Ministry of Personnel, Public Grievances & Pensions, Sahai has been appointed in place of Subhash Chandra Garg, a 1983-batch IAS officer, who will be retiring on October 31, 2019. In a significant development, senior IAS officer of 1986-batch, Sanjeev Nandan Sahai, has been appointed as the new power secretary […] Read more
NTPC Tenders for 1000 MW Solar Projects Under DBDT Scheme Updated On Mon, Oct 21st, 2019 by Saurenergy NTPC has tendered for setting up solar power projects under the DBDT scheme to a maximum capacity of 1000 MW. NTPC Ltd. has issued a tender, inviting bids from eligible parties for setting up of grid-connected solar power projects under the Develop Build Demonstrate Transfer (DBDT) scheme to a maximum capacity of 1000 MW. The […] Read more
SECI Issues RfS for 400 MW ‘Round-the-Clock’ RE Power Updated On Mon, Oct 21st, 2019 by Saurenergy SECI has issued its RfS for the “Round-the-Clock” supply of 400 MW renewable energy to NDMC and Dadra & Nagar Haveli. The Solar Energy Corporation of India (SECI) has issued its Request for Selection (RfS) document for the selection of renewable energy developers for “Round-The-Clock” supply of 400 MW renewable energy to the (200 MW) […] Read more
CERC Brings Relief on Safeguard Duty for ACME Solar and Arisun Updated On Fri, Oct 18th, 2019 by Saurenergy CERC has provided compensatory relief for ACME and Arisun after accepting their plea to consider the imposition of the safeguard duty as “Change in Law”. The Central Electricity Regulatory Commission (CERC) has in its latest order, provided compensatory relief for ACME Jaipur Solar and Arisun Clean Energy after accepting their plea to consider the imposition […] Read more
Punjab Tenders for Empanelment and Installation of Rooftop Solar Projects Updated On Thu, Oct 17th, 2019 by Saurenergy PSPCL has issued a tender for the empanelment of EPC contractors for setting up of a cumulative 30 MW grid-connected rooftop solar projects in Punjab The Punjab State Power Corporation (PSPCL) has issued a tender for the empanelment of EPC contractors for setting up of a cumulative 30 MW grid-connected rooftop solar projects in the […] Read more
MNRE Issues Guidelines for Bidding Process for Wind-Solar Hybrid Projects Updated On Wed, Oct 16th, 2019 by Saurenergy MNRE has issued draft guidelines for the tariff-based competitive bidding process for the procurement of power from wind-solar hybrid projects. The Ministry of New and Renewable Energy (MNRE) has issued a draft of the guidelines for the tariff-based competitive bidding process for the procurement of power from grid-connected wind-solar hybrid projects. The Ministry had in […] Read more
Uttarakhand Discom to Carry Forward Surplus Non-Solar RPO to Meet Solar RPO Deficit Updated On Wed, Oct 16th, 2019 by Saurenergy UERC has allowed UPCL to carry forward its surplus non-solar RPO from FY 2018-19 to meet its deficit of non-solar and solar RPO in the present fiscal. The Uttarakhand Electricity Regulatory Commission (UERC) has in its latest order approved the petition filed by the Uttarakhand Power Corporation Limited (UPCL) to carry forward its surplus non-solar […] Read more
SECI Amends Manufacturing-Linked Tender to Include 7 GW Solar Projects Updated On Tue, Oct 15th, 2019 by Saurenergy SECI has issued an amendment for its manufacturing linked solar tender, increasing the capacity of projects to be awarded from 6 GW to 7 GW. The Solar Energy Corporation of India (SECI) has issued an amendment for its manufacturing linked solar tender, increasing the capacity of projects to be awarded under the tender from 6 […] Read more