SUBSCRIBE NEWS LETTER

solar power information

MNRE Offers 6 Months Extension for Self Certification of Solar Inverters

MNRE has extended the deadline for the self-certification of inverters for PV applications in the country by a period of 6 months, to December 31, 2020. The Ministry of New and Renewable Energy (MNRE) has announced that it has extended the deadline for the self-certification of inverters for PV applications in the country by a […]

Read more

MNRE Issued Guidelines for Procurement of Round The Clock Power

MNRE has issued the guidelines for the procurement of Round The Clock power from renewable energy power projects, complemented with thermal power projects. The Ministry of New and Renewable Energy (MNRE) has issued the guidelines for the tariff-based competitive bidding process for the procurement of Round The Clock power from grid-connected renewable energy power projects, […]

Read more

SECI Extends Timelines for Implementation of 97.5 MW Rooftop Solar Scheme

SECI has extended the timelines for the implementation of the 97.5 MW rooftop solar PV systems scheme for government buildings in different zones of India. The Solar Energy Corporation of India (SECI) has extended the timelines for the implementation of the 97.5 MW grid-connected rooftop solar PV systems scheme for government buildings in different zones […]

Read more

Farmers in UP City to get 160 Solar Pumps Under KUSUM Scheme

The Pilibhit agriculture department in UP is set to provide 160 solar pumps to farmers on subsidy, under the PM KUSUM scheme of the Union government. The Pilibhit agriculture department in Uttar Pradesh (UP) is set to provide 160 solar pumps to farmers on subsidy, under the Pradhan Mantri Kisan Urja Suraksha Utthan Mahabhiyan (KUSUM) scheme of the Union […]

Read more

Guidelines Issued for Implementation of Off-Grid Solar Plants in RESCO Mode

MNRE has issued the final guidelines for the implementation of off-grid solar power packs/ plants in RESCO mode and model PPA. In reference to its previous order issued in April 2020 for issuing extension of off-grid and decentralized solar PV applications programme –Phase III till March 31, 2021, the Ministry of New and Renewable Energy […]

Read more

Tender Issued for 25 MW Canal Top Solar Plants in Karnataka

SSCL has tendered for setting up 25 MW solar plants on the Upper Tanga Canal Stretches passing through the Shivamogga City in Karnataka on DBFOT Basis. Shivamogga Smart City (SSCL) has issued a tender, inviting bids from eligible firms for setting up of 25 MW solar PV power plants on the Upper Tanga Canal Stretches […]

Read more

SECI Tenders for 5 MW Solar Power Plant at Tuticorin Port

SECI has issued a tender for setting up a 5 MW grid-connected solar PV power plant at the V. O. Chidambaranar Port Trust (VOCPT) in Tuticorin, Tamil Nadu. The Solar Energy Corporation of India (SECI) has issued a tender, inviting bids from eligible firms for setting up a 5 MW grid-connected solar PV power plant […]

Read more

Future of Residential Solar: Post Covid Period

Till Dec 2019, India was having 757 MW of cumulative installed solar capacity by the residential segment, out of 5440 MW of rooftop solar (RTS). As per Phase II of Grid connected RTS implementation plan by MNRE released in Aug 2019 last year, India has set for itself a modest and calculated target of 4GW […]

Read more

MNRE Issues Guidelines for Wind Power Procurement from 2.5 GW ISTS Projects

The Ministry of New and Renewable Energy (MNRE) has issued guidelines for implementation of ‘scheme for a tariff-based competitive bidding process for procurement of renewable energy power from 2500 MW ISTS connected blended wind power projects’. The government has implemented the scheme for procurement of power at a tariff discovered via a transparent process of […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll