ALMM: India’s Solar Module Manufacturing Capacity Touches 50.8 GW Updated On Tue, Jul 9th, 2024 by Saurenergy India’s total enlisted solar module manufacturing capacity has now touched 50.8 Gigawatt (GW), the latest ALMM list issued by the Ministry of New and Renewable Energy (MNRE) revealed. The recent Approved List of Models and Manufacturers (ALMM) lists a total of 93 solar module manufacturing plants in India, against the earlier figure of 90. The […] Read more
Gautam Solar Files Patent Design Registration for Innovative Solar Panel Packaging Updated On Tue, Jul 9th, 2024 by Saurenergy Gautam Solar, among India’s Top 10 Solar Panel Manufacturers, has announced the filing of a patent design registration for its groundbreaking packaging pallet designed for the storage and transportation of solar panels. The new pallet design promises to enhance the efficiency and safety of solar panel logistics, especially important for large-scale solar power plants. The […] Read more
News Briefs July 9: Largest BESS In Netherlands, Vietnam Green Policy, Thai Solar Deal Updated On Tue, Jul 9th, 2024 by Saurenergy Netherlands ‘largest’ co-located BESS Commissioned By Powerfield Dutch independent power producer (IPP) PowerField has commissioned a 52MWh BESS at a PV plant. Co-located with a 28MWp solar PV plant, the battery is supposed to be the largest in Netherlands. The solar and storage project in Wannepervee combines 28MWp of solar with a 52MWh BESS. The […] Read more
Waaree Renewable Tech Bags 335 MW EPC Order From Acciona Energy Updated On Mon, Jul 8th, 2024 by Saurenergy Waaree Renewable Technologies Limited, a subsidiary of Waaree Energies Limited, India’s largest manufacturer of solar PV modules, has been awarded the Engineering, Procurement, and Construction (EPC) contract for ACCIONA Energy’s subsidiary Juna Renewable Energy Private Limited’s 412.5 MWp/335 MW photovoltaic project in Rajasthan. The project, located in Kawani Village, Bikaner district, is a utility-scale solar […] Read more
DVC’s Investment Plan To 2030 Focus More On Solar, Pumped Storage Updated On Mon, Jul 8th, 2024 by Saurenergy Kolkata based Damodar Valley Corporation (DVC) on Friday announced that it plans to invest Rs 20,000 crore by 2030 to install nearly 4,000 MW of solar capacity. DVC currently is a primarily thermal power firm, with 6540 MW of its existing installed generation capacity of 6,700 MW thermal. the corporation and its plans can have […] Read more
Africa Solar Progress: The Next Solar Frontier? Updated On Mon, Jul 8th, 2024 by Saurenergy Africa is a gold mine, both literally and figuratively. Providing essential resources for the global transition to clean energy, Africa also holds immense potential for renewable energy development. By 2023, the continent had 62.11 GW of renewable energy capacity installed, a figure that could rise substantially with more funding. Africa as a continent – and […] Read more
Uttar Pradesh Proves It’s Solar Ready As Lucknow Hosts Solar Trailblazers Event Updated On Sun, Jul 7th, 2024 by Saurenergy Friday, July 5 was a big day on the solar calendar for Uttar Pradesh, as multiple solar leaders collected in the state capital to brainstorm the way ahead for Uttar Pradesh to occupy a deserving place in India’s solar states. Graced by the Deputy Chief Minister, Uttar Pradesh Shri Brajesh Pathak as Chief Guest, the […] Read more
Even Better Together- Five Ways Solar Is Better With Other Green Energy Options Updated On Thu, Jul 4th, 2024 by Saurenergy Solar power is the fastest-growing energy source globally. The Global Market Outlook for Solar Power 2024-2028 report reveals that in 2023, global solar installations surged by 87 per cent compared to the previous year. In 2023, 447 GW of new solar capacity was added, up from 239 GW in 2022, bringing the world’s total solar […] Read more
Oriana Power Secures Order For 25MWp Agro PV Project In Delhi Updated On Thu, Jul 4th, 2024 by Saurenergy Oriana Power Ltd., a renewable energy solutions provider, bagged an order to set up a 25MWp Group Net Metering Solar Power Plant (Agro Photovoltaic) for a real estate company. This project is developed with underground cabling up to 10km including RoW for a 25 MWp captive solar power. The plant is under the Group Net […] Read more