Solar Powered Drone Unveiled at Aero India 2023 Updated On Fri, Feb 17th, 2023 by Saurenergy Garuda Aerospace, an Indian startup that makes drones, unveiled its solar-powered drone- “SURAJ”, at Aero India 2023, that was held in Bengaluru. Satheesh Reddy, former DRDO Chairman and current Principal Scientific Adviser to the Defence Minister, unveiled the drone. As per the startup, the solar drone is designed for surveillance operations, offering “real-time information to […] Read more
Malaysia’s Gentari Marks Entry into Australia With Acquisition of Wirsol Energy Updated On Fri, Feb 17th, 2023 by Saurenergy Malaysian clean energy company Gentari has concluded the acquisition of Wirsol Energy and its assets from the Australia-based Wircon Group. Wirsol owns as well as operates projects in renewable energy and storage projects across New South Wales, Victoria and Queensland. The acquisition marks Gentari’s entry into Australia’s renewable energy market. Wirsol Energy’s portfolio entails 422 […] Read more
MSEDCL RFS For 200 MW Wind Power From Intra State Projects Updated On Fri, Feb 17th, 2023 by Saurenergy The Maharashtra State Electricity Distribution Company Limited (MSEDCL) has issued a tender for the procurement of 200 MW of wind power through a competitive bidding process followed by e-reverse auction from intra state wind power projects. The state discom has placed a ceiling tariff of Rs 2.65/kWh for the bids. Bidders will have to provide […] Read more
India Will Blacklist Renewable Energy Companies for Missing Deadlines Updated On Fri, Feb 17th, 2023 by Saurenergy The Union Ministry of New and Renewable Energy (MNRE) has issued an order which says that renewable energy firms could be blacklisted in case they fail to meet deadlines to complete renewable energy projects. The order states that the blacklisting will be for a period of three to five years. India has introduced blacklisting of […] Read more
India’s Renewable Energy Installation Stands at 168 GW, Coal-Based Power Grows 536 MW in a Year Updated On Thu, Feb 16th, 2023 by Saurenergy Central Electricity Authority has revealed in its installed electricity capacity report that the renewable energy capacity of the country has crossed 168 GW but the speed of the RE expansion doesn’t give out a comfortable picture considering India’s 2030 targets. The RE installed capacity of India as on January 31, 2023 stands at 168,399 MW. […] Read more
Volkswagen’s EV Charging Firm Electrify America Launches New Project for EV Solar Charging Updated On Thu, Feb 16th, 2023 by Saurenergy Volkswagen’s fast-charging public network firm Electrify America has announced the launch of “Solar Glow 1”, a cleantech project in the Golden State of California. The 75 MW solar power project to be established in San Bernardino County, California will produce 225,000 MWh of clean electricity annually. For the project that looks at charging electric vehicles […] Read more
BHEL Issues Tender for O&M of 7.5 MW, 5 MW Solar Power Plants Updated On Thu, Feb 16th, 2023 by Saurenergy Bharat Heavy Electronics Ltd (BHEL) has invited bids for 5 MW and 7.5 MW solar power plants. The services include annual O&M and upkeep of the plants for a period of 1 year. The plants are set up at BHEL, Trichy, Tamil Nadu. The document download end date is 21-02-2023 at 3:00 PM. the bid […] Read more
NTPC Operationalises 50 MW Solar Project in Nokhra, Bikaner Updated On Thu, Feb 16th, 2023 by Saurenergy State-owned entity National Thermal Power Corporation (NTPC) has said in a BSE revelation that consequent upon successful commissioning, third part capacity of 50 MW out of 300 MW Nokhra Solar PV Project at Bikaner, Rajasthan, is declared on Commercial Operation from February 16, 2023. NTPC mentioned that the first part capacity of 100 MW has […] Read more
Dept of Science & Technology, Chandigarh Issues Tender for 4000kwp Canal Top Power Plant Updated On Thu, Feb 16th, 2023 by Saurenergy The Department of Science and Technology has issued a tender for the design, manufacture, supply, erection, testing and commissioning including warranty operation and maintenance for 10 years for a 4000kwp canal top solar photovoltaic power plant. The plant will be set up in Chandigarh. The bid submission start date is 21-02-2023 at 6:00 PM. The […] Read more