L&T Carves Out Renewable Energy Vertical In Its Infrastructure Segment
Effective from 1st September 2024, Larsen & Toubro (L&T) carved out a separate business vertical for renewable EPC out of its Power Transmission and Distribution (PT&D) business, within its Infrastructure Projects segment. L&T has created the Renewable EPC business, as an addition to its construction verticals. The move comes at a time when the division […]