MNRE Invites EoI for Evaluation of Solar Park Development Scheme Updated On Thu, Aug 12th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has invited Expression of Interest (EoI) from reputed experts and consultancy firms for evaluating the “Development of Solar Parks and Ultra Mega Solar Power Projects” scheme, which the ministry has been implementing since December 2014. The main objective of the scheme is to set up at least 50 […] Read more
Tata Power, AlJomaih Winners in RUMSL’s 500 MW Neemuch Solar Park Auction Updated On Wed, Aug 11th, 2021 by Saurenergy RUMSL’s third 500 MW auction continued to attract ever lower bids, as TP Saurya (Tata Power), and Saudi firm AlJomaih Energy and Water Company, pocketed the Neemuch park bids. While Tata Power won two parcels of 170 MW and 160 MW at Rs 2.14 and 2.149 respectively, Aljomaih won the remaining 170 MW with a […] Read more
Domestic Solar Manufacturers Collateral Damage In Tussle Between Govt And SC Updated On Wed, Aug 11th, 2021 by Saurenergy The ongoing tussle between the union government and the Supreme Court, where the apex court has repeatedly expressed its displeasure at the slow pace of filling of vacancies in courts, and lately in tribunals too, has come back to hurt solar manufacturers. Of course, for the sector as a whole, this is not the first […] Read more
Report Highlights Risks From Inaccurate Irradiation Data To Solar Projects In Africa Updated On Tue, Aug 10th, 2021 by Saurenergy A recent report developed by a solar electricity provider to African enterprises, CrossBoundary Energy (CBE), says that Data irregularities in estimating solar production can have significant impacts on both technical teams and solar buyers. Solar production/ solar irradiation is the measurement of how much sunlight shines in each location and therefore how much electricity a […] Read more
GSECL Tenders for 224 MW of Grid-Connected Solar Projects Updated On Mon, Aug 9th, 2021 by Saurenergy A wholly-owned subsidiary of the Gujarat Urja Vikas Nigam, Gujarat State Electricity Corporation Limited has floated a tender for a 224 MW solar Photovoltaic grid-connected power plant. The tender has been issued for the power plants ranging from 10 MW to 55 MW at various substations of GETCO of Surendranagar, Morbi Kutchh, Jamnagar & Surat […] Read more
Madhya Pradesh Tenders for 225MW Solar Projects Under PM KUSUM Updated On Tue, Aug 3rd, 2021 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has invited bids for the selection of developers for implementation of approximately 225 MW(AC) grid-connected solar power plants connected to selected 33/11 kV substations under the PM KUSUM program at various locations in Madhya Pradesh. The project size to be installed per substation is 500 kW to 2 […] Read more
Rihand Floating Solar Project Hobbles Ahead, With UPERC Approval On Tariffs Updated On Tue, Aug 3rd, 2021 by Saurenergy Plans for a floating solar project, totaling 150 MW on the Rihand reservoir (linked to Rihand Dam) have finally crossed an important milestone, with the UPERC (Uttar Pradesh Electricity Regulatory Commission) finally approving the same, although not without some mild admonitions to SECI. The order was dated July 30, 2021, and uploaded later to the […] Read more
The 7-Point Checklist Before You Finalize Your Rooftop Solar System Updated On Mon, Aug 2nd, 2021 by Saurenergy Solar power is still considered new in India. It was in 2010 when Government of India launched National Solar Mission (NSM) as a key initiatives with an aim to promote sustainable ecological growth while solving for country’s energy security. From 1.2 GW in 2012 to 40 GW in 2021, Solar Energy in India today is […] Read more
Key Policy Challenges To a Thriving C&I Market for Solar In India Updated On Mon, Aug 2nd, 2021 by Saurenergy The Solar Energy sector has emerged as a potential green technology to address climate change issues by reducing dependence on conventional fossil fuel-based energy. India has a target to install 100 GW of solar energy capacity with a commitment to increase the renewable sources-based energy capacity to 175 GW by 2022. Under this, 40 GW […] Read more