ALMM, BCD Update- Developers Hope For Relief Soon Updated On Tue, Sep 6th, 2022 by Saurenergy Informed sources indicate that there are strong chances of the government considering developer pleas for extending applicability of ALMM conditions for domestic projects. A meeting was held between industry representatives and Minister of Power, New and Renewable Energy R K Singh on September 6. The agenda was a review meeting with key developers and other […] Read more
Robotic PV Panel Cleaning Firm Airtouch Solar Signs Agreement with ReNew Power Updated On Tue, Sep 6th, 2022 by Saurenergy Israel-based robotic PV panel cleaning specialist, Airtouch Solar has signed an agreement with ReNew Power, a leading Indian start-up that delves into renewable energy. Airtouch Solar signed orders in an overall scope of approximately USD 3.3 million with the Indian mega-corporation ReNew Power for the supply, installation, operation and maintenance of solar panels cleaning robots […] Read more
Ceylon Electricity Board Floats Tender for Solar PV Plants Updated On Mon, Sep 5th, 2022 by Saurenergy The Ceylon Electricity Board (CEB) is seeking proposals from potential developers (project proponents) for the construction of ground-mounted and floating solar PV power plants with a combined capacity of 30 MW on a build-own-operate basis with a 20-year operational period. The deadline for proposal submissions is October 27, 2022. Within 10 months of the power […] Read more
IRCON Renewable Issues Tender for Solar Power Projects for Karnataka Updated On Mon, Sep 5th, 2022 by Saurenergy IRCON Renewable Power (IRPL) has floated a tender for the supply of 500 MW of solar power projects at Pavagada in Karnataka. The last date for submitting the online bid is September 16, 2022, and the bids will be opened on September 17, 2022. As per the tender document, the completion period of this solar […] Read more
KSEB Floats 340 MW of Solar, Wind, Hydropower Tender Updated On Fri, Sep 2nd, 2022 by Saurenergy Kerala State Electricity Board (KSEB) has floated a tender for 340 MW cumulative capacity. This tender capacity includes solar (140MW), wind (100MW), and hydropower (100 MW) on a short-term basis to meet its Renewable Purchase Obligations (RPO) which will help achieve the renewable target from November 1, 2022 to May 31, 2023. According to the […] Read more
NTPC Trading Arm Invites EOI For RTC Green Power Updated On Fri, Sep 2nd, 2022 by Saurenergy NTPC Vidyut Vyapar Nigam Limited, a power trading subsidiary of NTPC Limited, has invited expressions of interest from renewable energy developers for round the clock (RTC) power supply for the medium to long term. The latest tender indicates the pace at which demand for green RTC power is going up, as utilities look to ensure […] Read more
The Bridge to 280 GW Of Solar. Corporate India Steps Up Updated On Thu, Sep 1st, 2022 by Saurenergy They have the money, resilience, and execution ability that can leave an indelible impact on India’s economy; but can the country’s corporates (C&I sector) open up a new growth engine for India’s solar movement? The time, it seems, has arrived. As always in India, among the stakeholders, there will be many who will want to […] Read more
IRCON Renewable Power Invites Bids for 500 MW Solar Project in Karnataka Updated On Tue, Aug 30th, 2022 by Saurenergy IRCON Renewable Power (IRPL) has floated a tender for engineering, procurement, and construction (EPC) work with a 220 kV substation for 500 MW of grid-connected solar power projects at Pavagada in Karnataka. The last date for submitting the online bid is September 20, 2022, and the bids will be opened on the same day. This […] Read more
Solar Scada Engineer Updated On Mon, Aug 29th, 2022 by Saurenergy Task & Responsibilities:- Lead the development and design process for all SCADA related topics for solar power plant Support the procurement team with technical expertise throughout different project phases Develop and coordinate the design of monitoring and control systems for utility scale solar PV i.e SCADA units, Power Plant Controller, RTU and IT equipment Specify […] Read more