SECI Invites Bids for Solar Power Projects upto 5 MW Updated On Wed, Apr 5th, 2023 by Saurenergy SECI invites bids for design, supply, installation, testing and commissioning including warranty, comprehensive operation & maintenance of solar power projects in India -rooftop and ground mounted (up to 5 MW) systems has been issued by Solar Energy Corporation of India (SECI). The tender closes on 18.05.2023 at 00:00 Hrs. The tender opens on 18.05.2023 at […] Read more
FY23’s Final Big Tender Is SECI’s Tender For 2000 MW ISTS Connected Solar Projects Updated On Fri, Mar 31st, 2023 by Saurenergy The Solar Energy Corporation of India (SECI) has issued atender for the selection of solar power developers for setting up of 2000 MW (2GW) inter-state transmission system ISTS-connected solar power projects in India. The tender is issued for Tranche XI. The tender follows a noticeable slowdown in fresh issue of tenders, as SECI focused on […] Read more
Gautam Solar’s Solar Modules that Promise Lower Installation Cost for Developers & EPC Updated On Mon, Mar 27th, 2023 by Saurenergy Solar module manufacturer Gautam Solar has filed a patent and design registration for innovation in solar panels. These reduce the installation cost of solar power plant at utility and rooftop scale. The firm claims that the innovation in solar modules halves the number of fasteners used during the installation of solar power plants. At megawatt […] Read more
Eight Solar Parks with 4995 MW Capacity in Bundelkhand Get Green Signal Updated On Thu, Mar 23rd, 2023 by Saurenergy MNRE Minister R.K. Singh revealed in the Lok Sabha today that eight solar parks with a cumulative of 4995 MW have been approved in the Bundelkhand region. This has been done with an aim to enhance the generation of solar energy. The solar parks that have been approved entail the Jalaun Solar Park for 1200 […] Read more
APL Apollo Tubes Partners Ornate Solar for Sustainability Updated On Thu, Mar 23rd, 2023 by Saurenergy In a key development to give a fillip to the solar industry of India, APL Apollo Tubes has collaborated with Ornate Solar for designing, engineering, building and manufacturing innovative structural solutions. The announcement was made by APL Apollo Tubes at ‘Nayi Soch’ Steel Building Solutions conference in Bengaluru. The new venture would complement the existing […] Read more
Goa CM Mulls Over Renewable Energy Expansion to 80 MW to Solarize Panaji Updated On Mon, Mar 20th, 2023 by Saurenergy The state of Goa requires producing 80 MW of renewable energy that may help the state government to make Panaji a solar city. This also needs to be substantiated with the efforts on the part of the people of Goa by installing more and more solar panels, believes Chief Minister of Goa, Pramod Sawant. Out […] Read more
Solar Waste Recycling: An Opportunity For India Updated On Sat, Mar 18th, 2023 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has added the solar modules and solar cells under the e-Waste Management Rules 2022 thereby fixing responsibility of the producers in terms of storing solar industry waste, filing regular returns, disclosing the panel and cell inventory separately and complying with the CPCB guidelines. The move is widely […] Read more
“Penetration In MSME Low, Market Untapped for Solar Rooftop Plant Developers,” Vikas Agarwal, Credit Fair Updated On Fri, Mar 17th, 2023 by Saurenergy With a transition in power consumption patterns worldwide due to climate change and the limitation of fossil fuels, the importance of green sources such as solar energy has increased significantly in the past few years. However, the initial installation cost often is a significant limitation for the widespread adoption of solar technology in residential and […] Read more
SECI Re-issues Tender for 100 MW Floating Solar at Getalsud Dam, Ranchi Updated On Thu, Mar 16th, 2023 by Saurenergy SECI has invited bids for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) floating solar PV project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand. It’s a global tender. The SECI tender says that the last date for bid submission has been kept on May 2, 2023 and […] Read more