NHPC Invites Bids to Select Renewable Energy Power Developers for 1500 MW Projects with Storage Updated On Mon, Oct 9th, 2023 by Saurenergy NHPC has issued a tender for the selection of renewable energy power developers for the supply of 1500 MW ‘Firm & Dispatchable’ power from ISTS connected Renewable Energy power projects coupled with energy storage system on anywhere in India basis under Tariff Based Competitive Bidding (TBCB) on BOO basis (Build-Operate-Own). It will be followed by […] Read more
Borosil Renewables Launches Innovative Solar Glass Options Updated On Mon, Oct 9th, 2023 by Saurenergy Borosil Renewables, India’s sole solar glass manufacturer that has been battling the threat of dumping by Chinese manufacturers ever since the government dropped the anti-dumping duty on imports, burnished its credentials as an innovative manufacturer, with a slew of launches at REI 2023. Among the key launches introduced by the firm were: High Transmission Antireflative Coated […] Read more
Rajasthan Notifies Renewable Energy Policy: Solar Keeps Wind In Shadow Updated On Sat, Oct 7th, 2023 by Saurenergy This week has turned out to be an eventful when it comes to the renewable energy policy landscape with the two leading states in capacity additions- Gujarat and Rajasthan unveiling their Renewable Energy Policies. Ambitions The policy newly unveiled policy strives for 90 GW of solar capacity in the state by decade-end. It also eyes […] Read more
RUMSL Issues Tender for 750 MW Wind-Solar Hybrid Power Projects Updated On Tue, Oct 3rd, 2023 by Saurenergy Rewa Ultra Mega Solar Limited (RUMSL) has issued a tender for the development of 750 MW wind-solar hybrid power projects in Madhya Pradesh. This project will be on a BOO basis (Build Own Operate) basis. Developers may also add storage capacity. The last date for submission of bids is November 17, 2023. Bids open on […] Read more
KSB Ltd Pockets Order for 800 Solar Water Pumping Systems from UP Govt Updated On Fri, Sep 29th, 2023 by Saurenergy Pune-headquartered firm, KSB Limited, which delves into the commissioning, inspection, servicing and maintenance of pumps, has received a letter of award for 800 solar water pumping systems under PM-Kusum III Scheme under Component B. The value of the order is pegged at INR 27.78 crores and been awarded by the Department of Agriculture, Uttar Pradesh. […] Read more
Solar Bids Below Rs 2? BCD Holds Up Solar Tariffs In India Updated On Thu, Sep 28th, 2023 by Saurenergy Even as prices of China-made solar cells and modules continue to slide to unprecedented lows, power consumers are likely to benefit only partially, thanks to the Basic Customs Duty (BCD) of 40 percent that the government has on module imports, besides the 25% on solar cell imports. While the drop in prices is welcome to […] Read more
(Senior) Power Electronics Controls Engineer Updated On Tue, Sep 26th, 2023 by Saurenergy Senior Power Electronics Controls Engineer will be driving development of innovative solutions around grid-forming application controls for PCS in utility scale energy storage solutions. This role demands expertise in power electronics, control theory, and programming to create innovative solutions that contribute to the integration of renewable energy sources and grid stabilization. Key responsibilities are: Design […] Read more
Gujarat Releases Draft Renewable Energy Policy-2023 with Focus on Wind-Solar Hybrid Technologies Updated On Thu, Sep 21st, 2023 by Saurenergy The Government of Gujarat has notified the Renewable Energy Policy-2023 for further encouraging setting up of renewable generation projects based on wind, solar and wind-solar hybrid technologies. The policy will come into effect from the date of notification and shall remain in operation up to June 2028 or till notification of the new policy, whichever […] Read more
SJVN Invites Developers to Bid for 1500 MW ISTS-Connected Wind-Solar Projects Updated On Thu, Sep 21st, 2023 by Saurenergy SJVN has issued a tender inviting bids from developers to establish 1500 MW ISTS-connected (Inter-State Transmission System) wind-solar hybrid projects in India. The last day to submit the bid is November 7, 2023. Bids open on November 8, 2023. The validity of the bid is 12 months from the last date of bid submission. SJVN […] Read more