BREDA Plans To Revive Its Non-Functional Off-Grid Solar Projects, Issues Tender Updated On Mon, Dec 11th, 2023 by Saurenergy The Bihar Renewable Energy Development Agency (BREDA) government has now planned to revive its non-functional off-grid solar power systems. It has also issued a tender in this direction, seeking developers who can execute the government plan. BREDA has issued the tender on the behalf of the state. BREDA has planned to connect its ailing off-grid […] Read more
NTPC Looks for Power Generators for Supply of 1500 MW Solar-Wind Projects Updated On Thu, Dec 7th, 2023 by Saurenergy NTPC Ltd. has issued a tender and invited online bids from eligible bidders on Single Stage Two Envelope (that is, envelope-I: technical bid and envelope-II: financial bid) with reverse auction for the selection of hybrid power generators for the supply of 1500 MW power from ISTS connected -solar-wind hybrid power projects anywhere in India (NTPC-Tranche-IV) […] Read more
SECI Invites Bids for 400 MWp Domestically Manufactured Solar Modules Updated On Tue, Dec 5th, 2023 by Saurenergy SECI has issued a tender for the manufacturing, testing, packing and forwarding, supply and transportation of 400 MWp domestically manufactured solar PV modules with domestically manufactured solar cells. The last date for the bid submission is December 23, 2023. Bidding opens on the same day, that is, December 23, 2023. The total capacity of PV […] Read more
TOPCOn Makes Inroads In India’s Solar Manufacturing Sector Updated On Fri, Dec 1st, 2023 by Saurenergy Around 2019, mono-PERC (Passivated Emitter Rear Contact) was well on its way to dominate the solar market in India, in a market that was ruled by polycrystalline modules until then. Researchers and developers had already estimated its dominance five years ago in 2014, but it took a wholesale shift to mono-PERC by leading Chinese manufacturers […] Read more
SECI Seeks Wind Power Developers for 1350 MW Wind Power Projects Updated On Fri, Dec 1st, 2023 by Saurenergy The Solar Energy Corporation of India (SECI) has floated a tender seeking Wind Power Developers for setting up of 1350 MW ISTS-connected wind power projects in India under tariff-based Competitive Bidding (SECI-Tranche-XVI). The last date to submit the bid in soft copy format is January 10, 2024. The last date to submit the bid in […] Read more
OREDA Issues Bid For Rooftop Solar, Allows Virtual Net-Metering Updated On Tue, Nov 28th, 2023 by Saurenergy The Odisha Renewable Energy Development Agency (OREDA) issued a tender seeking solar energy generators for installing rooftop solar systems under RESCO model. Under the model, the solar energy generator will install the rooftop solar systems in government buildings on and will charge the government rentals for their services. As per the tender documents, the interested […] Read more
GUVNL Looks to Procure 500 MW Hybrid Renewable Power Updated On Tue, Nov 28th, 2023 by Saurenergy Gujarat Urja Vikas Nagam Limited (GUVNL) has issued a tender seeking developers for a hybrid solar-wind projects. The state-utility sought to purchase the clean power from this hybrid project through competitive bidding process (followed by reverse e-auction). As per the tender documents of this 500 MW hybrid renewable energy projects (Phase I), GUVNL will also […] Read more
Odisha Plans To Boost Solar-Based Cold Storages, Issues Tender Updated On Thu, Nov 23rd, 2023 by Saurenergy The Odisha Renewable Energy Development Agency (OREDA) has issued a tender seeking developers to commence 38 solar cold storages in different parts of the state. As per the tender details, each solar-powered cold storage should have a capacity of around 10 Metric Tonnes (MT). OREDA asked the interested parties to submit their bids online by December 20 […] Read more
HPERC Approves Generic Levelized Tariff Of Solar Power At Rs 3.65/unit Updated On Tue, Nov 14th, 2023 by Saurenergy The Himachal Pradesh Electricity Regulatory Commission (HPERC) in its order has fixed the generic levelized tariff of solar energy projects at Rs 3.65 per unit for projects upto 100 MW. It also decided to fix the the tariff for projects between 100 MW to 500 MW at Rs 3.62 per unit. The rates were finalized […] Read more