SUBSCRIBE NEWS LETTER

solar power developers

ACME Solar Appoints Barclays, JPMorgan for private InvIT

So far, only three companies—L&T Infra, IRB Infra and India Grid Trust—have tapped the InvIT route for fundraising Renewable energy company ACME Solar Holdings Ltd has hired two investment banks as the company looks to start work on its proposed infrastructure investment trust (InvIT) amid a prolonged delay in a planned initial public offering (IPO), […]

Read more

Rupee fall puts Rs 28,000 crore solar projects at risk

With safeguard duty, this can crank up tariffs by 30 paise/unit for future projects Nearly half of the solar power capacities under implementation worth ~Rs 28,000 crore face viability risk because of the continuous fall in the rupee, which has made imported solar modules costlier and increased the cost of setting up solar plants. These […]

Read more

Azure Power Raises over ~US$ 400 Million Since Fiscal First Quarter

  Azure Power has one of the largest solar portfolios in India The Company’s 2GW+ pipeline has a weighted average tariff ~17% higher than the lowest solar bid in the market With the recent equity and debt financings, Azure Power is one of the best capitalized solar companies in India Azure Power (NYSE: AZRE), one […]

Read more

JinkoSolar Ranked as Top Performer for 4th Consecutive Yr by DNV GL

The global quality assurance and risk management company, DNV GL, tested over 300 bills of material (BOM) for more than 50 module manufacturers. One of the leading solar module manufacturers JinkoSolar Holding (JinkoSolar) has been recognized as a Top Performer on DNV GL’s 2018 PV Module Reliability Scorecard for the fourth consecutive year. Commenting on […]

Read more

SECI Extends Bid Submission Deadline for 750MW Solar Project in Rajasthan

The deadline for bid submission against the above RfS has been extended to 02.11.2018 (upto 1600 hrs IST), SECI. The Solar Energy Corporation of India (SECI), an arm of the Ministry of New and Renewable Energy (MNRE), has extended the bid submission deadline for ‘selection of solar power developers for setting up of 750 MW […]

Read more

What Happens When Low Quality, Unproven Materials are Used in Solar Panels?

Revealing the Results of over 4 million solar panels inspected in 275 installations across the world INTRODUCTION The quality of PV modules and the materials used in them can be best assessed by evaluating their performance in the field. Challenging climatic conditions, like those in India, cause severe environmental stresses for PV materials in the […]

Read more

Innergex Buys 260 MW Solar Project to Expand US Footprint

The company further said that, this 260 MWDC photovoltaic solar prospective project is almost ready to be built upon signing of an offtake contract. In a bid to expand its US footprint to seven states, Innergex Renewable Energy (Innergex) has acquired a photovoltaic solar prospective project of approximately 260 MWDC from Open Road Renewables and MAP Renewable […]

Read more

SECI Extends Bid Submission Deadline for 10GW Solar Project Till 12th Nov

As per the tender document, the techno-commercial bids would be opened on November 13, 2018. The Solar Energy Corporation of India (SECI), an arm of the Ministry of New and Renewable Energy (MNRE), has extended the bid submission deadline for its 10GW of inter-state transmission system (ISTS) connected solar capacities with 3 GW p.a. solar […]

Read more

SECI Extends Bids for UP’s 150MW Floating Solar Plants Till Oct 25

Additionally, SECI has also extended bid submission deadline for setting up of 2 MW solar power project with 1 MWH BESS at Kaza, Himachal Pradesh till October 25, 2018. State-owned Solar Energy Corporation of India (SECI) has extended the bid submission deadline for setting up of 150 MW (50 MW x 3) grid connected floating […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll