SECI Re-Issues Notice For Selection of SPDs For 2 MW Solar Projects at Army Posts in J&K Updated On Fri, Mar 22nd, 2019 by Saurenergy The solar projects will be developed at the army post in Siachen and an army post in Partapur. The Solar Energy Corporation of India (SECI) has issued a notice for the third time, inviting online bids for setting up of 2 MW solar power plants in Jammu and Kashmir. The solar projects will be developed […] Read more
MEDA Floats Tender For Rooftop Solar with Battery Backup Updated On Tue, Mar 19th, 2019 by Saurenergy The last date of bid submission is March 23, 2019. The Maharashtra Energy Development Agency (MEDA) has issued a second tender inviting bids for setting up of total 10 kW of grid-connected rooftop solar PV power plant with battery back up under rooftop net metering at five Anganwadi of Buldhana district in the state. The […] Read more
Rioglass Solar Signs Contract For World’s Largest CSP Plant Updated On Mon, Mar 18th, 2019 by Saurenergy Rioglass Solar signs Dubai 600 MW CSP Project order for both parabolic trough receiver tubes and mirrors with Abengoa Energía and Shanghai Electric. The record-breaking Dubai 700 MW CSP + 250 MW PV Hybrid Project Noor Energy 1, developed by ACWA Power in close cooperation with DEWA, Shanghai Electric Group Corporation as EPC, and Abengoa […] Read more
SECI Issues Tender For 2000 MW Solar Projects Under CPSU-II Updated On Mon, Mar 18th, 2019 by Saurenergy The projects will be developed on a Build-Own-Operate basis and the usages charges to be paid by the govt entities for the power has been set at a maximum of Rs 3.50/kWh. The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) document for the selection of Solar Power Developers (SPD) for […] Read more
SECI Extends Deadline For 3 GW Manufacturing Linked Solar Tender Updated On Mon, Mar 18th, 2019 by Saurenergy The deadline for submission has been extended from March 18, 2019, to April 4, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
GAIL Floats Tender For Solar Systems on Maharashtra Region Pipeline Updated On Thu, Mar 14th, 2019 by Saurenergy The last date of bid submission is April 2, 2019. GAIL India Ltd., the largest state-owned natural gas processing and distribution company in India, has issued a tender for commissioning of solar PV power systems at seven locations of the Maharashtra region pipeline. The brief scope of work for selected bidders will include the supply, […] Read more
RfS For 1200 MW Solar Power Projects Released (ISTS-IV) Updated On Wed, Mar 13th, 2019 by Saurenergy The maximum tariff payable to the Project Developer is fixed at Rs 2.65/ kWh for 25 years. The Solar Energy Corporation of India (SECI) has released the detailed Request for Selection (RfS) document for selection of solar power developers (SPDs) for setting up of 1200 MW ISTS Connected Solar Power Projects (ISTS-IV) on a pan […] Read more
Maharashtra Issues Tender For 184 MW Solar Projects for AG Feeders Updated On Wed, Mar 13th, 2019 by Saurenergy The last date for bid submission is April 16, 2019. The Maharashtra State Power Generation Company Limited (MAHAGENCO) has issued a tender inviting online bids for the development of 184 MW of grid-interactive solar PV power plants at various locations in the state. The successful bidder will also have to provide operations and maintenance (O&M) for 25 […] Read more
Coming up. A 100 MW Solar Park in Bangladesh with Saudi backing Updated On Tue, Mar 12th, 2019 by Saurenergy The AlFanar Group, a leading Saudi construction and manufacturing conglomerate, has agreed to provide a $100 million worth of financing for an upcoming solar project in Bangladesh. Financing has been a challenge for developers in Bangladesh, with projects struggling due to inability of the developers to raise funding.The Riyadh-based Alfanar signed a Memorandum of Understanding […] Read more