2022 For Solar: Solarisation, PLI Scheme, Transmission were Buzzwords Updated On Thu, Dec 29th, 2022 by Saurenergy As we head into year 2023, here is a review of 2022 in terms of policy-level initiatives with a lowdown on where the country stands with regards to renewable energy capacity as the year comes to a close. Impetus to RE transmission projects 2022 began with the Intra-State Green Energy Corridor Phase-II (InSTS GEC-II) scheme […] Read more
Pakistan PM Announces Solarisation of All Govt Buildings by Coming April Updated On Thu, Dec 29th, 2022 by Saurenergy Pakistan Prime Minister Shehbaz Sharif has said that the federal government has decided to install solar power panels on all government buildings in the country to harness green energy and reduce dependency on imported fossil-fuel based power. At first, the federal government buildings of Pakistan will be solarised and they will run entirely on Solar […] Read more
Solar Inverter Firm GoodWe Signs Deal for 50 MW RE Project in Pakistan Updated On Wed, Dec 28th, 2022 by Saurenergy Chinese firms are showing a fresh deal of commitment for the development of renewable energy projects as the South Asian country is facing its economic hardships and acute power generation challenges. According to reports, GoodWe, which claims to be leading smart energy solution providers based out of China, is bullish about boosting renewable energy in […] Read more
JinkoSolar’s 182mm TOPCon Cells’ Efficiency Rate Hits New High of 26.4% Updated On Wed, Dec 28th, 2022 by Saurenergy Early in December, leading solar panel manufacturer headquartered in Shanghai, China, JinkoSolar (Jinko) has revealed that it has made a substantial advancement in the creation of large-sized N-type cells. Jinko has demonstrated that it has attained a new high conversion efficiency rate for N-type TOPCon cells that are 182mm or greater in size, with China’s […] Read more
How Do Inverters Adapt To High-Power PV Modules? Updated On Tue, Dec 27th, 2022 by Saurenergy Background With the rapid development of solar cell and photovoltaic module technology, the nominal power of PV modules now regularly breaks through from 400W+ to 500W+ and even to 600W+. The rapid development and increase in power of modules has put forward new requirements for inverter adaptation. So how do you choose the appropriate inverter […] Read more
Daman District Invites Bids for Enhancement of 7.47 MW Diu Solar Plant Updated On Tue, Dec 27th, 2022 by Saurenergy UT Administration of Dadra & Nagar Haveli and Daman & Diu has solicited bids for the expansion of 2.56 MWp capacity at the 6 MW Solar PV Plant in Diu and 4.91 MW capacity at the 3 MWp Solar PV Plant in Diu. The last date for submitting the online bid is January 17, 2023, […] Read more
BHEL Invites Bids for O&M Services for 5 MW Solar Plant, Haridwar Updated On Tue, Dec 27th, 2022 by Saurenergy Bharat Heavy Electricals Limited (BHEL) has invited bids for Operations and Maintenance (O&M services) work of the 05 MW solar power plant at its heavy electrical equipment plant (HEEP) in Haridwar, Uttarakhand. The last date for submitting the bid of this 05 MW of Bharat Heavy Electricals Limited (BHEL) O&M tender is January 06, 2023, […] Read more
RVUNL Invites Bids for 810 MW STU Connected Solar Tender for RVUN Park, Bikaner Updated On Tue, Dec 27th, 2022 by Saurenergy To establish 810 MW of state transmission utility-connected solar power projects in RVUNL’s Ultra Mega Solar Park in Bikaner, Rajasthan Rajya Vidyut Utpadan Nigam (RVUNL) has requested bids from solar project developers. These projects will be built-own-operate projects. November saw the release of the tender, however, it was quickly withdrawn. The bids must be submitted […] Read more
GEDA Invites bid for 1.2 MW Solar Rooftop Plant Tender for District Hospital Updated On Mon, Dec 26th, 2022 by Saurenergy Goa Energy Development Agency (GEDA) has invited bids for 1.2 MW of grid-connected rooftop solar projects at North Goa and South Goa District hospitals, 600 KW for each. The last date to submit the bid is January 20, 2023, and the bids will be opened on the same day. This GEDA 1.2 MW of grid-connected […] Read more