8 Key Points From KUSUM Scheme Implementation Guidelines Updated On Thu, Jul 25th, 2019 by Saurenergy MNRE has issued guidelines for the implementation of the Rs 34,422 crore KUSUM Scheme The Ministry of New and Renewable Energy (MNRE) has issued guidelines for the implementation of the Rs 34,422 crore Pradhan Mantri Kisan Urja Suraksha evam Uthan Mahabhiyan (KUSUM) Scheme, that aims to provide both financial security and more sustainable water access […] Read more
Siemens Gamesa Signs Supply Contract for 94 MW Wind Farm in Brazil Updated On Thu, Jul 25th, 2019 by Saurenergy Siemens Gamesa will supply 27 SG 3.4-132 wind turbines for the Arizona and Honorato wind farm in Brazil with an installed capacity of 94 MW. Siemens Gamesa has signed its first contract with Brennand Investimentos to supply 27 SG 3.4-132 wind turbines for the Arizona and Honorato wind farms in Sento Sé, Bahia, Brazil with […] Read more
ADB, Partners to Increase Access to Clean Energy in Tonga Updated On Wed, Jul 24th, 2019 by Saurenergy ADB, Government of Tonga and other development partners have announced the beginning of construction on the country’s first off-grid solar power plant The Asian Development Bank (ADB) joined the Government of Tonga and other development partners to announce the beginning of construction on the country’s first off-grid solar power plant and distribution network for Tonga’s most […] Read more
Top 10 Turbine OEMs to Spend €2.3 bn on R&D by 2023 Updated On Wed, Jul 24th, 2019 by Saurenergy A new report has revealed that the R&D expenses among the world’s top ten wind turbine OEMs is expected to increase to € 2.3 billion by 2023. A new report has revealed that the research and development (R&D) expenses among the world’s top ten wind turbine original equipment manufacturers (OEMs) is expected to increase to […] Read more
Private e-2 Wheelers Also Covered Under Phase-II of FAME: Arvind Sawant Updated On Tue, Jul 23rd, 2019 by Saurenergy The scheme aims to support via subsidies about 7,000 e-Buses, 5 lakh e-3 Wheelers, 55,000 e-4 Wheeler Passenger Cars and 10 lakh e-2 Wheelers. In order to further boost electronic public (e-public) transport in the country, the government has taken various initiatives under the second phase of FAME India Scheme (Faster Adoption and Manufacturing of […] Read more
CEA Predicts 6-Fold Increase in RE Capacity by 2029-30 Updated On Tue, Jul 23rd, 2019 by Saurenergy The Central Electricity Authority predicted the rise in renewable energy capacity but said coal will still lead in power generation The Central Electricity Authority (CEA), India’s power-planning body, in a report said that India’s renewable energy capacity will sprint ahead and multiply almost six-fold in the next decade, while the share of coal-fired plants in […] Read more
EDF-Masdar Reach Financial Close on 400 MW Saudi Wind Project Updated On Tue, Jul 23rd, 2019 by Saurenergy The consortium consisting of EDF Renewables and Masdar has completed the financing of the Dumat Al Jandal utility-scale wind project in Saudi Arabia The consortium consisting of EDF Renewables and Masdar has completed the financing of the Dumat Al Jandal utility-scale wind project in Saudi Arabia, with the backing of Saudi and international banks. The […] Read more
GST Council to Decide on Tax Cut on EVs This Week Updated On Mon, Jul 22nd, 2019 by Saurenergy The GST Council will meet on July 25 and decide on lowering tax rates for EVs The GST Council, chaired by Finance Minister Nirmala Sitharaman, will meet on July 25 and decide on lowering tax rates for electric vehicles (EVs), officials said. The 36th meeting of the Council, which will happen through video conferencing, is also […] Read more
Energy Horizons 2019: The Curtailment Issue Updated On Sat, Jul 20th, 2019 by Saurenergy On day 2 of Energy Horizons 2019, a session titled ‘Circumventing the Challenge of Grid Adoption” was actually a session about the challenge of curtailment of renewable power by Discoms. A topic so sensitive, that even calling it that is an issue, apparently. Thankfully, a healthy discussion did follow, although a solution was still elusive […] Read more